1. appointment of an agency for organizing a swadeshi mela in the mahemdavad municipality area. 2. annual rate work for maintenance of pumping machinery, panel board etc. including all spare parts in water works department.; 3. maintenance of underground drainage in mehmadavad municipality. (second attempt); 4. acting as a consultant for procurement of goods on gem portal. (third attempt); 5. supply of various hp motors in drainage branch. (third attempt); 6. construction of toilet blocks in marwadivas. (fourth attempt); 7. annual rate work for maintenance of computers, printers and related electronic items in various departments of the municipality. (fifth attempt); 8. annual rate work for supply of goods in drainage department. (sixth attempt); 9. annual rate work for making flex banners in municipality. (sixth attempt). (gujarati image)
The tender document is a Request for Proposal (RFP) for selecting a bidder for the Design build finance operate and transfer of cement grinding units. It outlines the terms and conditions for a long-term agreement to construct and operate a cement grinding unit on a Design, Build, Finance, Operate, and Transfer (DBFOT) basis.
Agreement Duration : The agreement is valid for 30 years from the Scheduled Commercial Operation Date (SCOD).
Grant of Concession : The Owner grants the Concessionaire the right to access the project land and perform the scope of work.
Scope of Work : Includes designing, financing, construction, commissioning, stabilization, manufacturing of cement, operation and maintenance of project assets, and packaging and delivery of cement.
Raw Materials and Utilities : The Owner is responsible for providing raw materials and electricity.
Obligations of Concessionaire : Compliance with all applicable laws, maintaining safety standards, and ensuring the project assets meet performance parameters.
Commissioning and Stabilization : Detailed timelines and conditions for commissioning and stabilizing the grinding unit.
Conversion Charges : Payment terms for the conversion charges based on the lowest cost bid accepted by the Owner.
Liquidated Damages : Provisions for delay liquidated damages and shortfall liquidated damages.
Termination : Conditions under which the agreement can be terminated by either party and the consequences of termination.
Dispute Resolution : Any disputes arising under the agreement shall be resolved through arbitration.
Specifications and Standards : As per Ambuja standards
Annual Contracted Quantity of Cement
KPIs of Cement : Key KPIs of cement to be maintained
This document provides a comprehensive framework for the Concessionaire to develop and operate the cement grinding unit, ensuring compliance with all legal, technical, and operational requirements.