auction sale of [1] all size acsr conductor scrap scrap :- 16200 kg [2] scrap 11kv ht abc cable:- 5370 kg [3] scrap 11kv xlpe all. 3cx185sqmm cable:- 570 kg [4] scrap all size lt aerial bunched cable:- 130 kg [5] armoured alu cable scrap:- 70 kg [6] all size pvc alum cable wire scrap:- 5740 kg / [1] single phase energy meters scrap:- 264 nos. [2] 1ph meter scrap (poly carbonate):- 1527 nos. [3] 1 phase static meter scrap:- 34973 nos. [4] three phase three wire energy meter scrap:- 1 nos. [5] 3-ph lt static meter scrap:- 1537 nos. / [1] all size aaa conductor scrap:-9620 kg [2] m.s. girder, rail pole & its pieces:- 27750 kg / [1] mild steel- m s scrap:- 11355 kg [2] iron scrap :-4300 kg [3] 11kv c t p t set all sizes scrap:- 39 nos. [4] g.i. hardware misc. scrap:- 3570 kg [5] gi wires & gi scrap all types:- 992 kg / [1] air conditioner machine scrap:- 1 nos. [2] table fan scrap:-1 nos. [3] atp machine:- 1 nos. / [1] flaps scrap:- 8 nos. [2] tyre scrap big ( truck/trailo r ):-9 nos. [3] tubes scrap:- 8 nos.
The tender document is a Request for Proposal (RFP) for selecting a bidder for the Design build finance operate and transfer of cement grinding units. It outlines the terms and conditions for a long-term agreement to construct and operate a cement grinding unit on a Design, Build, Finance, Operate, and Transfer (DBFOT) basis.
Agreement Duration : The agreement is valid for 30 years from the Scheduled Commercial Operation Date (SCOD).
Grant of Concession : The Owner grants the Concessionaire the right to access the project land and perform the scope of work.
Scope of Work : Includes designing, financing, construction, commissioning, stabilization, manufacturing of cement, operation and maintenance of project assets, and packaging and delivery of cement.
Raw Materials and Utilities : The Owner is responsible for providing raw materials and electricity.
Obligations of Concessionaire : Compliance with all applicable laws, maintaining safety standards, and ensuring the project assets meet performance parameters.
Commissioning and Stabilization : Detailed timelines and conditions for commissioning and stabilizing the grinding unit.
Conversion Charges : Payment terms for the conversion charges based on the lowest cost bid accepted by the Owner.
Liquidated Damages : Provisions for delay liquidated damages and shortfall liquidated damages.
Termination : Conditions under which the agreement can be terminated by either party and the consequences of termination.
Dispute Resolution : Any disputes arising under the agreement shall be resolved through arbitration.
Specifications and Standards : As per Ambuja standards
Annual Contracted Quantity of Cement
KPIs of Cement : Key KPIs of cement to be maintained
This document provides a comprehensive framework for the Concessionaire to develop and operate the cement grinding unit, ensuring compliance with all legal, technical, and operational requirements.
Eligibility Criteria - Download