contracts for various transportation services are to be awarded by kheda district co-operative milk producers' union ltd - 1. transportation and distribution of cattle feed from kapadwanj and sahaj dairy cattle feed factory and bulk chilling centers to amul dairy affiliated village milk producer co-operative societies, stables, cattle sheds, and other necessary locations from 01.12.2023 to 31.03.2026, 2. transportation and distribution of fresh dairy and bakery products such as milk, cattle feed, and curd-filled crates from amul dairy, anand, through insulated vehicles to anand, kheda, and mahisagar districts and various other locations from 01.12.2023 to 31.03.2026, 3. transportation of milk through milk tankers from amul affiliated chilling centers located in the western region of amul dairy, anand, and bihar region from 01.02.2024 to 31.03.2026. (gujarati image).
The tender document is a Request for Proposal (RFP) for selecting a bidder for the Design build finance operate and transfer of cement grinding units. It outlines the terms and conditions for a long-term agreement to construct and operate a cement grinding unit on a Design, Build, Finance, Operate, and Transfer (DBFOT) basis.
Agreement Duration : The agreement is valid for 30 years from the Scheduled Commercial Operation Date (SCOD).
Grant of Concession : The Owner grants the Concessionaire the right to access the project land and perform the scope of work.
Scope of Work : Includes designing, financing, construction, commissioning, stabilization, manufacturing of cement, operation and maintenance of project assets, and packaging and delivery of cement.
Raw Materials and Utilities : The Owner is responsible for providing raw materials and electricity.
Obligations of Concessionaire : Compliance with all applicable laws, maintaining safety standards, and ensuring the project assets meet performance parameters.
Commissioning and Stabilization : Detailed timelines and conditions for commissioning and stabilizing the grinding unit.
Conversion Charges : Payment terms for the conversion charges based on the lowest cost bid accepted by the Owner.
Liquidated Damages : Provisions for delay liquidated damages and shortfall liquidated damages.
Termination : Conditions under which the agreement can be terminated by either party and the consequences of termination.
Dispute Resolution : Any disputes arising under the agreement shall be resolved through arbitration.
Specifications and Standards : As per Ambuja standards
Annual Contracted Quantity of Cement
KPIs of Cement : Key KPIs of cement to be maintained
This document provides a comprehensive framework for the Concessionaire to develop and operate the cement grinding unit, ensuring compliance with all legal, technical, and operational requirements.
Eligibility Criteria - Download