f.p. scheme at village ratanpur gamtal at kotar & nr.panchayat ta.kathlal - item no.1 excavation in all sorts of soil .by machinery including preparing etc. comp. (where qty can not be measured) j.c.b.- 2d x (0.18 cm) wheel , excavation for foundation in all sorts of soil including yellow sandy gravelly soils ,soft & hard murrum etc. in dry condition including depositing the excavated stuff in uniform layers in banks or as and where directed etc. complete for lead upto 500 m and all lift.(by machinery) excluding dewatering, providing & laying in position "nom mix" cement concrete using cement, sand and crushed aggregates by mass and machine mix for c.c./r.c.c.work incl. necessary formworks, centering,scaffolding, compaction by vibrator, curing as directed with all lead & lift etc. comp. without dewatering and excluding cost of steel reinforcement.(a) for founadation concrete/ general purpose (a) c.c.nominal mix,m- 15 and msa-40 mm, providing & placing in position reinforcement bars including cutting, bending, welding joints where necessary, hooking etc. complete as per drawing for all lead and lifts. (a) tmt / crs (fe 500 d), providing and laying in position 90 mm dia p.v.c. pipe for weep holes in abutments, wing walls, retaining walls etc.
The tender document is a Request for Proposal (RFP) for selecting a bidder for the Design build finance operate and transfer of cement grinding units. It outlines the terms and conditions for a long-term agreement to construct and operate a cement grinding unit on a Design, Build, Finance, Operate, and Transfer (DBFOT) basis.
Agreement Duration : The agreement is valid for 30 years from the Scheduled Commercial Operation Date (SCOD).
Grant of Concession : The Owner grants the Concessionaire the right to access the project land and perform the scope of work.
Scope of Work : Includes designing, financing, construction, commissioning, stabilization, manufacturing of cement, operation and maintenance of project assets, and packaging and delivery of cement.
Raw Materials and Utilities : The Owner is responsible for providing raw materials and electricity.
Obligations of Concessionaire : Compliance with all applicable laws, maintaining safety standards, and ensuring the project assets meet performance parameters.
Commissioning and Stabilization : Detailed timelines and conditions for commissioning and stabilizing the grinding unit.
Conversion Charges : Payment terms for the conversion charges based on the lowest cost bid accepted by the Owner.
Liquidated Damages : Provisions for delay liquidated damages and shortfall liquidated damages.
Termination : Conditions under which the agreement can be terminated by either party and the consequences of termination.
Dispute Resolution : Any disputes arising under the agreement shall be resolved through arbitration.
Specifications and Standards : As per Ambuja standards
Annual Contracted Quantity of Cement
KPIs of Cement : Key KPIs of cement to be maintained
This document provides a comprehensive framework for the Concessionaire to develop and operate the cement grinding unit, ensuring compliance with all legal, technical, and operational requirements.
Eligibility Criteria - Download