corrigendum : facility management services - lumpsum based - healthcare; patient support services; consumables to be provided by service provider (inclusive in contract cost); supply of medical equipment: r.o water with cooler: -, 1. raw water pump + cooler 20 ltr, capacity: 100 lph, make: lubi, qty: 01, 2. pressure sand filter + carbon filter, type: vertical pressure vessel, moc: frp, capacity: 100 lph,, filter media: sand, pebbles, gravels + carbon, qty: 01, 3. antiscalant dosing pump, type: electronic diaphragm, capacity: 0 to 5 lph,, make: italy/equivalent, qty: 01, 4. micron cartridge filter unit (replaceable), moc: frp, capacity: 100 lpf, qty: 01, 5. high pressure pump (vertical multistage centrifugal), moc: ss, capacity: 100 lph, make: lubi, qty: 01, 6. ro module, thin film composite spiral wound membrane,, membrane: polyamide, make: hydranautics/dow/equivalent,, membrane housing: frp, qty: 01.
The tender document is a Request for Proposal (RFP) for selecting a bidder for the Design build finance operate and transfer of cement grinding units. It outlines the terms and conditions for a long-term agreement to construct and operate a cement grinding unit on a Design, Build, Finance, Operate, and Transfer (DBFOT) basis.
Agreement Duration : The agreement is valid for 30 years from the Scheduled Commercial Operation Date (SCOD).
Grant of Concession : The Owner grants the Concessionaire the right to access the project land and perform the scope of work.
Scope of Work : Includes designing, financing, construction, commissioning, stabilization, manufacturing of cement, operation and maintenance of project assets, and packaging and delivery of cement.
Raw Materials and Utilities : The Owner is responsible for providing raw materials and electricity.
Obligations of Concessionaire : Compliance with all applicable laws, maintaining safety standards, and ensuring the project assets meet performance parameters.
Commissioning and Stabilization : Detailed timelines and conditions for commissioning and stabilizing the grinding unit.
Conversion Charges : Payment terms for the conversion charges based on the lowest cost bid accepted by the Owner.
Liquidated Damages : Provisions for delay liquidated damages and shortfall liquidated damages.
Termination : Conditions under which the agreement can be terminated by either party and the consequences of termination.
Dispute Resolution : Any disputes arising under the agreement shall be resolved through arbitration.
Specifications and Standards : As per Ambuja standards
Annual Contracted Quantity of Cement
KPIs of Cement : Key KPIs of cement to be maintained
This document provides a comprehensive framework for the Concessionaire to develop and operate the cement grinding unit, ensuring compliance with all legal, technical, and operational requirements.
Eligibility Criteria - Download