invitation of quotations from registered vendors for the upcoming convocation ceremony for the preparation of gold medals for shri govind guru university, godhra, with the following details- 1. the medals will have to be made with silver electroplated with gold. the size of the medal will be 50 mm in diameter. the medal should have 50 g silver and 1.0 g gold (twenty four (24) carat (for plating)). 2. labour charge: one side of medal (side 1) institute name and logo to be engraved; other side of medal (side 2) student name, year of passing, academic discipline and department name or "donor name" as the case may be engraved. 3. there shall be provisions (suspending ring/kunda) as shown in diagram for putting ribbon in the medal. 4. box size 10 cm x 10 cm x 3 cm, covered with velvet outside and stains cushioning inside. 5. red ribbon for one meter must be given with the medal. (guj image)
The tender document is a Request for Proposal (RFP) for selecting a bidder for the Design build finance operate and transfer of cement grinding units. It outlines the terms and conditions for a long-term agreement to construct and operate a cement grinding unit on a Design, Build, Finance, Operate, and Transfer (DBFOT) basis.
Agreement Duration : The agreement is valid for 30 years from the Scheduled Commercial Operation Date (SCOD).
Grant of Concession : The Owner grants the Concessionaire the right to access the project land and perform the scope of work.
Scope of Work : Includes designing, financing, construction, commissioning, stabilization, manufacturing of cement, operation and maintenance of project assets, and packaging and delivery of cement.
Raw Materials and Utilities : The Owner is responsible for providing raw materials and electricity.
Obligations of Concessionaire : Compliance with all applicable laws, maintaining safety standards, and ensuring the project assets meet performance parameters.
Commissioning and Stabilization : Detailed timelines and conditions for commissioning and stabilizing the grinding unit.
Conversion Charges : Payment terms for the conversion charges based on the lowest cost bid accepted by the Owner.
Liquidated Damages : Provisions for delay liquidated damages and shortfall liquidated damages.
Termination : Conditions under which the agreement can be terminated by either party and the consequences of termination.
Dispute Resolution : Any disputes arising under the agreement shall be resolved through arbitration.
Specifications and Standards : As per Ambuja standards
Annual Contracted Quantity of Cement
KPIs of Cement : Key KPIs of cement to be maintained
This document provides a comprehensive framework for the Concessionaire to develop and operate the cement grinding unit, ensuring compliance with all legal, technical, and operational requirements.
Eligibility Criteria - Download