procurement of equipment for the health department; consumables - 1. spades (9-inch, with handles) - nos. 2. spades (6-inch, with handles) - nos. 3. pickaxes (with handles) - nos. 4. rakes (with handles) - nos. 5. brooms (400g weight, without wooden handles) - nos. 6. brooms (300g, without wooden handles) - nos. 7. empty drums/containers - nos. 8. masks (cloth) - nos. 9. aprons (with reflective strips) - nos. 10. hand gloves (branded/good quality) - nos. 11. spades/scoops (with 3-foot iron rods) - nos. 12. hammers/mallets (specify weight) - nos. 13. crowbars - nos. 14. rods (3-foot, soft/flexible, wooden) - nos. 15. baskets (18-inch width) - nos. 16. pans/troughs (18-inch size) - nos. 17 15.00 sickles (with handles, approx. 8 in hes) nos. 18 5.00 pickaxes nos. 19 25.00 spades nos. 20 10.00 coir rope kg 21 10.00 jute kg 22 25.00 locks (good quality, branded) nos. 23 300.00 wooden sticks/poles nos. 24 400.00 spade handles nos. 25 400.00 pickaxe handles nos.
The tender document is a Request for Proposal (RFP) for selecting a bidder for the Design build finance operate and transfer of cement grinding units. It outlines the terms and conditions for a long-term agreement to construct and operate a cement grinding unit on a Design, Build, Finance, Operate, and Transfer (DBFOT) basis.
Agreement Duration : The agreement is valid for 30 years from the Scheduled Commercial Operation Date (SCOD).
Grant of Concession : The Owner grants the Concessionaire the right to access the project land and perform the scope of work.
Scope of Work : Includes designing, financing, construction, commissioning, stabilization, manufacturing of cement, operation and maintenance of project assets, and packaging and delivery of cement.
Raw Materials and Utilities : The Owner is responsible for providing raw materials and electricity.
Obligations of Concessionaire : Compliance with all applicable laws, maintaining safety standards, and ensuring the project assets meet performance parameters.
Commissioning and Stabilization : Detailed timelines and conditions for commissioning and stabilizing the grinding unit.
Conversion Charges : Payment terms for the conversion charges based on the lowest cost bid accepted by the Owner.
Liquidated Damages : Provisions for delay liquidated damages and shortfall liquidated damages.
Termination : Conditions under which the agreement can be terminated by either party and the consequences of termination.
Dispute Resolution : Any disputes arising under the agreement shall be resolved through arbitration.
Specifications and Standards : As per Ambuja standards
Annual Contracted Quantity of Cement
KPIs of Cement : Key KPIs of cement to be maintained
This document provides a comprehensive framework for the Concessionaire to develop and operate the cement grinding unit, ensuring compliance with all legal, technical, and operational requirements.
Eligibility Criteria - Download
No documents uploaded for this tender yet.