repair, maintenance, and installation of plant/ systems/equipments (version 2) - dismantling, shifting, reinstallation, testing and commissioning; as per scope of work; service provider; repair and restoration of caaqms station location at sp stadium ahmedabad qty. 01 station: replacement of the spare parts listed below, followed by testing, commissioning, and restoration of the system to full operational status within the stipulated timeline: 1. external air compressor 220v-50hz pump-1, 2. picolino pump unit 230v 50/60 hz-1, 3. mgc 101 vacm 50/60 hz inside jag-1, 4.3kva/2.4kw, input 230v, output 230v, dc voltage 72v -1, 5.12 v 65ah battery-6, 6.2.0 ton 5 star inverter ac-1, 7.fedus power cord 1.8m, 18awg power cable-15, 8.wired multimedia keyboard-1, 9.wired optical mouse-1, 10.d-link rj45 cat 6 patch cord ethernet 1m lan cable-8, 11.fedus 10 meter heavy duty outdoor cat 6 cable-1, 12.river fox 15-pin male to male 1.5meter vga cable for monitors-1, 13.d-link des-1008c 8-port 10/100 desktop switch (white)-1, 14.16 sq.mm 4-core copper conductor a lt power cable 2xfy (30 mtr)-30, 15.teflon 6mm sample tube and vent line (100mtr)-100, 16.n2 cylinder with regulator-1, 17.32 core 0.5 sqmm industrial flexible copper cable 20 (mtr)-20, 18.ugreen usb to rs232 db9 serial male converter-2, 19.spike guard (8 socket, 230v)-2, 20.electrician for internal cabling & retrofit of all devices at location-1, 21.inspection and potential repair of second ac 2.0 ton unit by technician-1, 22.charges for recommissioning of the system- 1.
The tender document is a Request for Proposal (RFP) for selecting a bidder for the Design build finance operate and transfer of cement grinding units. It outlines the terms and conditions for a long-term agreement to construct and operate a cement grinding unit on a Design, Build, Finance, Operate, and Transfer (DBFOT) basis.
Agreement Duration : The agreement is valid for 30 years from the Scheduled Commercial Operation Date (SCOD).
Grant of Concession : The Owner grants the Concessionaire the right to access the project land and perform the scope of work.
Scope of Work : Includes designing, financing, construction, commissioning, stabilization, manufacturing of cement, operation and maintenance of project assets, and packaging and delivery of cement.
Raw Materials and Utilities : The Owner is responsible for providing raw materials and electricity.
Obligations of Concessionaire : Compliance with all applicable laws, maintaining safety standards, and ensuring the project assets meet performance parameters.
Commissioning and Stabilization : Detailed timelines and conditions for commissioning and stabilizing the grinding unit.
Conversion Charges : Payment terms for the conversion charges based on the lowest cost bid accepted by the Owner.
Liquidated Damages : Provisions for delay liquidated damages and shortfall liquidated damages.
Termination : Conditions under which the agreement can be terminated by either party and the consequences of termination.
Dispute Resolution : Any disputes arising under the agreement shall be resolved through arbitration.
Specifications and Standards : As per Ambuja standards
Annual Contracted Quantity of Cement
KPIs of Cement : Key KPIs of cement to be maintained
This document provides a comprehensive framework for the Concessionaire to develop and operate the cement grinding unit, ensuring compliance with all legal, technical, and operational requirements.
Eligibility Criteria - Download