sell of cut up scrap of condemned overaged/underaged coach sr no. 1) demu dpc 169009/wr 2) demu tc 164106/wr 3) demu tc 16540/wr 4) demu tc 16409/wr 5) demu tc 16414/wr 6) demu tc 16407/wr note %u2013 all reclaimed items to be returned by purchaser to railway in safe and sound condition, a. mechanical items to be reclaimed from each demu dpc & demu tc coaches, sr. no. 1 to 06 (1) complete wheel sets with axle box assembly with roller bearing assembly -04 nos (in sr. no. 01 to 06 coaches) (2) schaku coupler (end c and end c) in demu dpc 169009 with all its assemblies, sub-assemblies and parts=(1+1)=02 nos. (3) schaku coupler (end b and end c) in demu tc 164106 with all its assemblies, sub-assemblies and parts=(1+1)=02 nos. (4) schaku coupler (end b and end a) in demu tc 16540, demu tc 16414, demu tc 16407 with all its assemblies, sub-assemblies and parts=(1+1)=02 nos (5) schaku coupler (end a and end c) in demu tc 16409 with all its assemblies, sub-assemblies and parts=(1+1)=02 nos. (6) side buffer=04nos (in sr no. 1 coaches), & side buffer = 02 nos (in sr no. 02 to 06 coaches) b. all electrical reclaimed items like as speedometer, wearing pieces, auxiliary motor, bldc fan, light fitting, battery,tractor motor, fuel oil are stripped or to be strip in workshop before handing over of coaches for auction sale. c. all mechanical reclaimed items like as bogie section item, cattle guard, gear case are stripped or to be strip in workshop before handing over of coaches for auction sale. d. all reclaimed items to be returned by purchaser to railway in safe and sound condition a. mechanical items. scrap delivery mode by number. e. all types of demu coaches given at wagon cutting yard at north gate, 32 quarter dahod on line no. 02 & delivery of demu coaches will be given by line no. 01 or as per railway convenience. [2] [ wooden- 8116.51 kgs, ms- 57679.452 kgs, al-2256.475 kgs, brass/bronze-18.751 kgs, cu-2117.609 kgs, (glass+pvc+frp+uic rubber+bakelite)- 7332.568 kgs, corten steel(irms41)- 108383.77 kgs (approx)] note-indicative approximate composition only for reference not to claim) [3] custodian- sse inspection (r) dahod [4] location - dahod workshop [5] gst-18% [6] cutting allowed for easy loading fdp 50 days (note :- maximum free delivery period 50 days. no further free time under any circumstances be considered) [7]-coaches cutting and loading to be carefully done by purchaser and no littering to be done by concerned labour of purchaser at cutting location. (8) there is no delivery and cutting allowed on sunday & holidays as well as cutting allowed only during office working hours. (9) delivery date will be alloted after cutting of d.o quantity of all wagons. (10) part delivery will be not allowed.
The tender document is a Request for Proposal (RFP) for selecting a bidder for the Design build finance operate and transfer of cement grinding units. It outlines the terms and conditions for a long-term agreement to construct and operate a cement grinding unit on a Design, Build, Finance, Operate, and Transfer (DBFOT) basis.
Agreement Duration : The agreement is valid for 30 years from the Scheduled Commercial Operation Date (SCOD).
Grant of Concession : The Owner grants the Concessionaire the right to access the project land and perform the scope of work.
Scope of Work : Includes designing, financing, construction, commissioning, stabilization, manufacturing of cement, operation and maintenance of project assets, and packaging and delivery of cement.
Raw Materials and Utilities : The Owner is responsible for providing raw materials and electricity.
Obligations of Concessionaire : Compliance with all applicable laws, maintaining safety standards, and ensuring the project assets meet performance parameters.
Commissioning and Stabilization : Detailed timelines and conditions for commissioning and stabilizing the grinding unit.
Conversion Charges : Payment terms for the conversion charges based on the lowest cost bid accepted by the Owner.
Liquidated Damages : Provisions for delay liquidated damages and shortfall liquidated damages.
Termination : Conditions under which the agreement can be terminated by either party and the consequences of termination.
Dispute Resolution : Any disputes arising under the agreement shall be resolved through arbitration.
Specifications and Standards : As per Ambuja standards
Annual Contracted Quantity of Cement
KPIs of Cement : Key KPIs of cement to be maintained
This document provides a comprehensive framework for the Concessionaire to develop and operate the cement grinding unit, ensuring compliance with all legal, technical, and operational requirements.
Eligibility Criteria - Download