sell of p-way bridge 98050114 scrap p-way bridge miscellaneous items mainly consisting of bridge chequered plates, bridge stools, pathways, released side pathways, bridge pathway plates, central pathway plates, released bed plates, m.s. bridge chequered plates, corroded/damaged perforated m.s. bridge plates, stretcher bar pattas, angles, released top inspection cradles, fish plates, tie plates, bars, slide chairs, bearing plates, metal rail sleepers, beater steel, point clamps, s/e spanners, files, ci rammers, c-clamps, bar claws, crowbars, c-clamp channels and other miscellaneous p-way bridge scrap of various types and sizes. material is used, broken, worn out and beyond economical repair (ber), unserviceable and u/s for railway use, sold on as is where is basis. loading by purchaser. custodian: dms/scrap/pardi.
The tender document is a Request for Proposal (RFP) for selecting a bidder for the Design build finance operate and transfer of cement grinding units. It outlines the terms and conditions for a long-term agreement to construct and operate a cement grinding unit on a Design, Build, Finance, Operate, and Transfer (DBFOT) basis.
Agreement Duration : The agreement is valid for 30 years from the Scheduled Commercial Operation Date (SCOD).
Grant of Concession : The Owner grants the Concessionaire the right to access the project land and perform the scope of work.
Scope of Work : Includes designing, financing, construction, commissioning, stabilization, manufacturing of cement, operation and maintenance of project assets, and packaging and delivery of cement.
Raw Materials and Utilities : The Owner is responsible for providing raw materials and electricity.
Obligations of Concessionaire : Compliance with all applicable laws, maintaining safety standards, and ensuring the project assets meet performance parameters.
Commissioning and Stabilization : Detailed timelines and conditions for commissioning and stabilizing the grinding unit.
Conversion Charges : Payment terms for the conversion charges based on the lowest cost bid accepted by the Owner.
Liquidated Damages : Provisions for delay liquidated damages and shortfall liquidated damages.
Termination : Conditions under which the agreement can be terminated by either party and the consequences of termination.
Dispute Resolution : Any disputes arising under the agreement shall be resolved through arbitration.
Specifications and Standards : As per Ambuja standards
Annual Contracted Quantity of Cement
KPIs of Cement : Key KPIs of cement to be maintained
This document provides a comprehensive framework for the Concessionaire to develop and operate the cement grinding unit, ensuring compliance with all legal, technical, and operational requirements.