sell of scrap junk ferrous such as rusted, m.s. sheet, pipe, channel, g.i.sheet, duct, binding wire, binding strips, gi wire, fire extinguisher body, damaged empty grease barrel, damaged oil barrel, koltar barrel, with or without dry paint, rusted barrel, empty paint drum , electrical items/electric fittings, , rusty bucket, rusty drum, packing plate, filter, rake ballast, tubelight fitting, pan, trunk, spray bottle, sleeve, lamp, door, window, grill, jali, mesh, various type of wire, transformer body, pole, tube, rectangle bar, round bar, sealing wire, wire rope, tube, frame, tray, cooler body, fan cage, filter, tank, shutter, accessories, stand, table, fan body, boom,various size of fiiter, boring, cage and cover fan body, display board, fins, panel box, electric panel, board,bicycle,capacitor bank,hvac filter,train toilet door,frame with wooden attached,filter,patra, electrode,electric junction,air filtration box,tube axial,exhaust blower, ferrous frame,dimantled fiber reinforeced plastic,rusted bracket, and other rusted misc ferrous items such as : angle, channel, structure, tikam ( pick axe), powrah, boggie frame window, m.s. patra, ms sheet, g i sheet, corrogated sheet,spacer bar, boxes, panels, signaling lights, fiber,capacitor bank, etc. with of without minor non ferrous attachment old used and u.s.
The tender document is a Request for Proposal (RFP) for selecting a bidder for the Design build finance operate and transfer of cement grinding units. It outlines the terms and conditions for a long-term agreement to construct and operate a cement grinding unit on a Design, Build, Finance, Operate, and Transfer (DBFOT) basis.
Agreement Duration : The agreement is valid for 30 years from the Scheduled Commercial Operation Date (SCOD).
Grant of Concession : The Owner grants the Concessionaire the right to access the project land and perform the scope of work.
Scope of Work : Includes designing, financing, construction, commissioning, stabilization, manufacturing of cement, operation and maintenance of project assets, and packaging and delivery of cement.
Raw Materials and Utilities : The Owner is responsible for providing raw materials and electricity.
Obligations of Concessionaire : Compliance with all applicable laws, maintaining safety standards, and ensuring the project assets meet performance parameters.
Commissioning and Stabilization : Detailed timelines and conditions for commissioning and stabilizing the grinding unit.
Conversion Charges : Payment terms for the conversion charges based on the lowest cost bid accepted by the Owner.
Liquidated Damages : Provisions for delay liquidated damages and shortfall liquidated damages.
Termination : Conditions under which the agreement can be terminated by either party and the consequences of termination.
Dispute Resolution : Any disputes arising under the agreement shall be resolved through arbitration.
Specifications and Standards : As per Ambuja standards
Annual Contracted Quantity of Cement
KPIs of Cement : Key KPIs of cement to be maintained
This document provides a comprehensive framework for the Concessionaire to develop and operate the cement grinding unit, ensuring compliance with all legal, technical, and operational requirements.
Eligibility Criteria - Download
No documents uploaded for this tender yet.