sell of scrap ms junk ferrous released from lcw and others consisting of corroded material, girder plate,door,tie bar cast iron signaling material, location box full and half,padastal for gate(signaling) ms cutting ,hand lorrey,st sleeper, wagon plate, fire bucket, fire extinguisher, parts of blower, guard sheet, driver sheet, all type of brake cylinder, gi doors, angle & sheet,all type of beds of pipe & angle, corroded ms rings, released nut bolt rivets , shackle pin, jali, fan jali, em & rubber pads, all types of headlights, doors corroded plates, sheet, drums, pipes , corroded angle , channel, tank, ms fitting, panel board, panel box, wire, rod, saria, signaling ms/gi items,panel, small pieces of ms/ci, iron rod,ele. loco parts, side body and other wagon parts corroded misc.items of all type of ms/ci scrap of sorts and sizes and old used unserviceable., (except wta items, spring, rail). fdp 40 days. material should be loaded with one end from lot as per description. cutting will be allowed for easy loading. mode of delivery by actual weight.
The tender document is a Request for Proposal (RFP) for selecting a bidder for the Design build finance operate and transfer of cement grinding units. It outlines the terms and conditions for a long-term agreement to construct and operate a cement grinding unit on a Design, Build, Finance, Operate, and Transfer (DBFOT) basis.
Agreement Duration : The agreement is valid for 30 years from the Scheduled Commercial Operation Date (SCOD).
Grant of Concession : The Owner grants the Concessionaire the right to access the project land and perform the scope of work.
Scope of Work : Includes designing, financing, construction, commissioning, stabilization, manufacturing of cement, operation and maintenance of project assets, and packaging and delivery of cement.
Raw Materials and Utilities : The Owner is responsible for providing raw materials and electricity.
Obligations of Concessionaire : Compliance with all applicable laws, maintaining safety standards, and ensuring the project assets meet performance parameters.
Commissioning and Stabilization : Detailed timelines and conditions for commissioning and stabilizing the grinding unit.
Conversion Charges : Payment terms for the conversion charges based on the lowest cost bid accepted by the Owner.
Liquidated Damages : Provisions for delay liquidated damages and shortfall liquidated damages.
Termination : Conditions under which the agreement can be terminated by either party and the consequences of termination.
Dispute Resolution : Any disputes arising under the agreement shall be resolved through arbitration.
Specifications and Standards : As per Ambuja standards
Annual Contracted Quantity of Cement
KPIs of Cement : Key KPIs of cement to be maintained
This document provides a comprehensive framework for the Concessionaire to develop and operate the cement grinding unit, ensuring compliance with all legal, technical, and operational requirements.