sell of scrap released ferrous from lcw and others consisting of corroded material, ms cutting wagon plate,release fdms, coach guidance box, pct, all types of racks, vhf box, repeater, all type of battery boxes,battery stand, cable termination box, e.c. socket, route indicator, shunt unit, ground connection, solar frame with or without stand, relay, signal unit, u-link panel, pan iron, soldering iron machine, all types of ladders, m.s./corroded angles, ms doors, pipe fittings, all types of junction & location boxes, flasher light, boom operating machine, point machine without motor, tie rod, all types of ms fencing, boom, signaling items, rope wires, all sizes of ms drums, m.s. jali, tiebar fencing, display board,lightly corroded plates, old sheet, drums, pipes, channel, electric fitting, panel,loco related materials board steel wire rod saria, almirah, chairs(wheel,office), table small pieces of ms/cs, iron rod, side body filter jali and other corroded misc. ms/cs items of all types, sorts and sizes, old, used and unserviceable., (except wta items, spring, rail). (04 nos. cutting allowed in junction & location box & 01 nos. cutting allowed if the material is longer than the length of the loading truck. (note:- purchaser must keep fire extinguisher for avoiding & losses caused by any fire accident & purchaser is responsible for any fire accident.) material should be loaded from one end of the lot as per description. mode of delivery by actual weight. fdp 40 days.
The tender document is a Request for Proposal (RFP) for selecting a bidder for the Design build finance operate and transfer of cement grinding units. It outlines the terms and conditions for a long-term agreement to construct and operate a cement grinding unit on a Design, Build, Finance, Operate, and Transfer (DBFOT) basis.
Agreement Duration : The agreement is valid for 30 years from the Scheduled Commercial Operation Date (SCOD).
Grant of Concession : The Owner grants the Concessionaire the right to access the project land and perform the scope of work.
Scope of Work : Includes designing, financing, construction, commissioning, stabilization, manufacturing of cement, operation and maintenance of project assets, and packaging and delivery of cement.
Raw Materials and Utilities : The Owner is responsible for providing raw materials and electricity.
Obligations of Concessionaire : Compliance with all applicable laws, maintaining safety standards, and ensuring the project assets meet performance parameters.
Commissioning and Stabilization : Detailed timelines and conditions for commissioning and stabilizing the grinding unit.
Conversion Charges : Payment terms for the conversion charges based on the lowest cost bid accepted by the Owner.
Liquidated Damages : Provisions for delay liquidated damages and shortfall liquidated damages.
Termination : Conditions under which the agreement can be terminated by either party and the consequences of termination.
Dispute Resolution : Any disputes arising under the agreement shall be resolved through arbitration.
Specifications and Standards : As per Ambuja standards
Annual Contracted Quantity of Cement
KPIs of Cement : Key KPIs of cement to be maintained
This document provides a comprehensive framework for the Concessionaire to develop and operate the cement grinding unit, ensuring compliance with all legal, technical, and operational requirements.