sitc of 4 mp fixed indoor ip dome cameras. , sitc of 32 channel or higher ip nvr. , sitc of surveillance grade cmr nvr hdd storage. , sitc of all in one workstation pc for cctv client operation. , sitc of 32 inch or larger uhd ips operator display. , sitc of 55 inch or larger professional or commercial uhd ips. , sitc of managed layer 2 gigabit poe or poe plus switches. , sitc of liu or odf with minimum 12 fibre positions. , sitc of single mode optical sfp modules. , sitc of cat 6a patch panel. , sitc of 19 inch, minimum 9u equipment rack. , sitc of minimum 6 core os2 armoured single mode ofc. , sitc of cat 6a, 4 pair, solid bare copper, 23 or 24 awg lan cable. , sitc of 5kva true online double conversion, single phase ups, 230 v, 50 hz. , sitc of independent oem compatible smf vrla battery banks. , sitc of compatible ups redundancy transfer arrangement. , sitc of power cabling and distribution for the complete cctv system. , system integration, configuration, testing, commissioning and handing over. - sitc of bcas compliant scctv system with 3 years oem warranty and subsequent 3 years aicamc | quantity - 1249
The tender document is a Request for Proposal (RFP) for selecting a bidder for the Design build finance operate and transfer of cement grinding units. It outlines the terms and conditions for a long-term agreement to construct and operate a cement grinding unit on a Design, Build, Finance, Operate, and Transfer (DBFOT) basis.
Agreement Duration : The agreement is valid for 30 years from the Scheduled Commercial Operation Date (SCOD).
Grant of Concession : The Owner grants the Concessionaire the right to access the project land and perform the scope of work.
Scope of Work : Includes designing, financing, construction, commissioning, stabilization, manufacturing of cement, operation and maintenance of project assets, and packaging and delivery of cement.
Raw Materials and Utilities : The Owner is responsible for providing raw materials and electricity.
Obligations of Concessionaire : Compliance with all applicable laws, maintaining safety standards, and ensuring the project assets meet performance parameters.
Commissioning and Stabilization : Detailed timelines and conditions for commissioning and stabilizing the grinding unit.
Conversion Charges : Payment terms for the conversion charges based on the lowest cost bid accepted by the Owner.
Liquidated Damages : Provisions for delay liquidated damages and shortfall liquidated damages.
Termination : Conditions under which the agreement can be terminated by either party and the consequences of termination.
Dispute Resolution : Any disputes arising under the agreement shall be resolved through arbitration.
Specifications and Standards : As per Ambuja standards
Annual Contracted Quantity of Cement
KPIs of Cement : Key KPIs of cement to be maintained
This document provides a comprehensive framework for the Concessionaire to develop and operate the cement grinding unit, ensuring compliance with all legal, technical, and operational requirements.