supply of - alkaline battery 9v , copper binding wire 0.5 mm diameter , copper wire bare 8 swg or 4 mm dia. , crocodile pin set , current selective switch 16a , elcb 25a 2 pole , electrical sequential control circuit 4 channel , g.i. sheet plain 22 swg or 0.64 mm thickness 1200 x 2500 mm , g.i. sheet plain 24 swg or 0.55 mm thickness 1200 x 2500 mm , g.i. sheet plain 26 swg or 0.45 mm thickness 1200 x 2500 mm , grinding wheel coarse for pedestal grinder , hpsv ignitor 150w , hpsv lamp holder 150 w , hydrometer for battery testing , intermediate switch , led 5 mm 3v blue , led 5 mm 3v green , led 5 mm 3v red , led 5 mm 3v yellow , led lamp holder with cap , li charging cell 2000 mah , m.s. angle 35 x 35 x 05 mm , m.s. pipe 01 inch or 25 mm dia. 2.5 mm thickness , m.s. pipe 01.5 inch or 38 mm dia 3.5 mm thickness , m.s. round bar dia 10 mm , m.s. square bar 25 x 25 mm , m.s. wire dia. 04 mm , male female 5a , push button switch on off , plywood laminated sheet 200 x 150 x 03 mm , remote control switching system 4 module , rg - 6 cable connector , rj 45 cable connector , sanmaica wooden board 10 x 12 inch , solar plate 3v 150 ma , touch base smart switch with sensing and remote control , transformer 230 by 6 0 6 v , transformer 230 by 6v, 500ma , v belt a35 , v belt a42 - iti veraval boq raw material | quantity - 1212
The tender document is a Request for Proposal (RFP) for selecting a bidder for the Design build finance operate and transfer of cement grinding units. It outlines the terms and conditions for a long-term agreement to construct and operate a cement grinding unit on a Design, Build, Finance, Operate, and Transfer (DBFOT) basis.
Agreement Duration : The agreement is valid for 30 years from the Scheduled Commercial Operation Date (SCOD).
Grant of Concession : The Owner grants the Concessionaire the right to access the project land and perform the scope of work.
Scope of Work : Includes designing, financing, construction, commissioning, stabilization, manufacturing of cement, operation and maintenance of project assets, and packaging and delivery of cement.
Raw Materials and Utilities : The Owner is responsible for providing raw materials and electricity.
Obligations of Concessionaire : Compliance with all applicable laws, maintaining safety standards, and ensuring the project assets meet performance parameters.
Commissioning and Stabilization : Detailed timelines and conditions for commissioning and stabilizing the grinding unit.
Conversion Charges : Payment terms for the conversion charges based on the lowest cost bid accepted by the Owner.
Liquidated Damages : Provisions for delay liquidated damages and shortfall liquidated damages.
Termination : Conditions under which the agreement can be terminated by either party and the consequences of termination.
Dispute Resolution : Any disputes arising under the agreement shall be resolved through arbitration.
Specifications and Standards : As per Ambuja standards
Annual Contracted Quantity of Cement
KPIs of Cement : Key KPIs of cement to be maintained
This document provides a comprehensive framework for the Concessionaire to develop and operate the cement grinding unit, ensuring compliance with all legal, technical, and operational requirements.