supply of - ammeter dc with external shunt , air ratchet with standard accessories , angle plate adjustable , circlip pliers contracting , circlip pliers expanding , circlip pliers contracting , cylinder liner , dc ohmmeter , dial gauge type 1 gr a , different type of engine bearing model , different type of piston model , engineers stethoscope , fuel injection pump dismantling tool kit with universal vice , fuel injection pump diesel, ve pump , fuel injection pump dpc pumps , grease gun , grease gun heavy duty trolley type , growler , hand reamers adjustable , hand shear universal , hollow punch set of seven pieces , injector , left cut snips , lifting jack screw , magneto spanner set with 8 spanners , oil stone , star head screw driver set of 5 pieces , piston ring compressor , piston ring expander and remover , piston ring groove cleaner , rivet sets snap and dolly combined , starter motor , straight edge gauge , taps and wrenches , telescope gauge , vacuum gauge , valve spring compressor , vice grip pliers , refractometer , grinding machine , pneumatic rivet gun with standard accessories - automobile items | quantity - 79
The tender document is a Request for Proposal (RFP) for selecting a bidder for the Design build finance operate and transfer of cement grinding units. It outlines the terms and conditions for a long-term agreement to construct and operate a cement grinding unit on a Design, Build, Finance, Operate, and Transfer (DBFOT) basis.
Agreement Duration : The agreement is valid for 30 years from the Scheduled Commercial Operation Date (SCOD).
Grant of Concession : The Owner grants the Concessionaire the right to access the project land and perform the scope of work.
Scope of Work : Includes designing, financing, construction, commissioning, stabilization, manufacturing of cement, operation and maintenance of project assets, and packaging and delivery of cement.
Raw Materials and Utilities : The Owner is responsible for providing raw materials and electricity.
Obligations of Concessionaire : Compliance with all applicable laws, maintaining safety standards, and ensuring the project assets meet performance parameters.
Commissioning and Stabilization : Detailed timelines and conditions for commissioning and stabilizing the grinding unit.
Conversion Charges : Payment terms for the conversion charges based on the lowest cost bid accepted by the Owner.
Liquidated Damages : Provisions for delay liquidated damages and shortfall liquidated damages.
Termination : Conditions under which the agreement can be terminated by either party and the consequences of termination.
Dispute Resolution : Any disputes arising under the agreement shall be resolved through arbitration.
Specifications and Standards : As per Ambuja standards
Annual Contracted Quantity of Cement
KPIs of Cement : Key KPIs of cement to be maintained
This document provides a comprehensive framework for the Concessionaire to develop and operate the cement grinding unit, ensuring compliance with all legal, technical, and operational requirements.