supply of - arrow cross mark stamp , steel ruler , metal scale , mat kutir , stamp pad , small empty container , pencils , sharpener , eraser , blue ball pen , red ball pen , ink bottle , pins , sealing wax , glue bottle , flexible wire , matchbox , razor blade , large thick needle , cloth piece meter , cardboard pieces , kraft paper , brown paper , candles , chalk , blank paper slip book , pencil carbon paper , white cotton tape , tag 8 inch size , gum kraft paper , safety pins , cotton twine balls , jute twine , thin cotton thread ball , plastic rope , thick cotton rope ball , coir rope , drawing pins , cotton cloth piece , polythene bag , lock , cellotape , rubber bands , paper cutter , poker- needle with stand , plastic box , stapler , stapler pins , upin box , punch box , fevi stick , araldite adhesive tube , sticker sheets-white , sticker sheets colour , punch machine , id card cover with string-horizontal , id card cover without string horizontal , id card cover with string vertical , id card cover without string vertical , cd 700 mb recordable with cover , dvd 4.7 gb recordable with cover , a4 size paper , legal size paper , foolscap paper , report file a4 size , report file legal size , plastic file a4 size , plastic file legal size , register1 , register2 , voucher book , sketch pens , marker blue , marker black , whitener , pen drive , plastic tray , spiral notebook , brass seal , identification seal , thick cardboard pieces for sealing , highlighter , calculator , thick sewing thread ball for cloth , color flags - election stationery | quantity - 143866
The tender document is a Request for Proposal (RFP) for selecting a bidder for the Design build finance operate and transfer of cement grinding units. It outlines the terms and conditions for a long-term agreement to construct and operate a cement grinding unit on a Design, Build, Finance, Operate, and Transfer (DBFOT) basis.
Agreement Duration : The agreement is valid for 30 years from the Scheduled Commercial Operation Date (SCOD).
Grant of Concession : The Owner grants the Concessionaire the right to access the project land and perform the scope of work.
Scope of Work : Includes designing, financing, construction, commissioning, stabilization, manufacturing of cement, operation and maintenance of project assets, and packaging and delivery of cement.
Raw Materials and Utilities : The Owner is responsible for providing raw materials and electricity.
Obligations of Concessionaire : Compliance with all applicable laws, maintaining safety standards, and ensuring the project assets meet performance parameters.
Commissioning and Stabilization : Detailed timelines and conditions for commissioning and stabilizing the grinding unit.
Conversion Charges : Payment terms for the conversion charges based on the lowest cost bid accepted by the Owner.
Liquidated Damages : Provisions for delay liquidated damages and shortfall liquidated damages.
Termination : Conditions under which the agreement can be terminated by either party and the consequences of termination.
Dispute Resolution : Any disputes arising under the agreement shall be resolved through arbitration.
Specifications and Standards : As per Ambuja standards
Annual Contracted Quantity of Cement
KPIs of Cement : Key KPIs of cement to be maintained
This document provides a comprehensive framework for the Concessionaire to develop and operate the cement grinding unit, ensuring compliance with all legal, technical, and operational requirements.
Eligibility Criteria - Download