supply of - cable shielded, screened 3 core , nmea 5 pin a code moulded ip68 canbus cable 4 mtr , nmea 5 pin a code moulded ip68 canbus cable 1.5 mtr , cmt4 type connectors , nmea 5 pin a code 6 way multi 4t junction , metal, polycorbonate jb with 6 nos cable gland , potentiometer 250 ohms , potentiometer ea, sa sendor , terminator male pins , nmea 2000 water level sender , fuel limiter relay module- tank level processor module , hall effect sensors , nmea 5 pin a code t junction , simrad adapt cable , omron relay , nmea 5 pin a code moulded ip68 canbus cable 12 mtr , nmea 5 pin a code moulded ip 68 canbus cable 5 mtr , nmea 5 pin a code moulded ip 68 canbus cable 3 mtr , anti sense ngx1 bidirectional convertor , d-sub connector male, female , data cable- screened 5 core 5 mtr , rudder angle adapter for ra, sa, ea sender , nmea 2000 fuel level sensor - procurement of canbus system spares including sensors for acv h 196 and h 198 | quantity - 371
The tender document is a Request for Proposal (RFP) for selecting a bidder for the Design build finance operate and transfer of cement grinding units. It outlines the terms and conditions for a long-term agreement to construct and operate a cement grinding unit on a Design, Build, Finance, Operate, and Transfer (DBFOT) basis.
Agreement Duration : The agreement is valid for 30 years from the Scheduled Commercial Operation Date (SCOD).
Grant of Concession : The Owner grants the Concessionaire the right to access the project land and perform the scope of work.
Scope of Work : Includes designing, financing, construction, commissioning, stabilization, manufacturing of cement, operation and maintenance of project assets, and packaging and delivery of cement.
Raw Materials and Utilities : The Owner is responsible for providing raw materials and electricity.
Obligations of Concessionaire : Compliance with all applicable laws, maintaining safety standards, and ensuring the project assets meet performance parameters.
Commissioning and Stabilization : Detailed timelines and conditions for commissioning and stabilizing the grinding unit.
Conversion Charges : Payment terms for the conversion charges based on the lowest cost bid accepted by the Owner.
Liquidated Damages : Provisions for delay liquidated damages and shortfall liquidated damages.
Termination : Conditions under which the agreement can be terminated by either party and the consequences of termination.
Dispute Resolution : Any disputes arising under the agreement shall be resolved through arbitration.
Specifications and Standards : As per Ambuja standards
Annual Contracted Quantity of Cement
KPIs of Cement : Key KPIs of cement to be maintained
This document provides a comprehensive framework for the Concessionaire to develop and operate the cement grinding unit, ensuring compliance with all legal, technical, and operational requirements.
Eligibility Criteria - Download