supply of - center punch. , spanner ring set of 12 , spanners socket , air impact wrench with standard accessories 1 by 2 , angle plate , calliper inside with spring 15 cm , callipers outside with spring 15 cm , chisels cross cut , compression testing gauge suitable for diesel engine with standard accessories , cylinder bore gauge , different type of piston model , dividers with spring 15 cm , drift punch copper 15 cm , drill twist various sizes 1.5 mm to 15 mm by 0.5mm , engineers stethoscope , fuel injection pump dismantling tool kit universal vice , hand operated crimping tool up to 4mm to 10mm , hand reamers adjustable 10.5 to 11.25 mm, 11.25 to 12.75 mm, 12.75 to 14.25 mm and 14.25 to 15.75 mm , hand shear universal 250mm , injector multi hole type, pintle type , magneto spanner set with 8 spanners , radiator pressure cap , rivet sets snap and dolly combined 3mm, 4mm, 6mm head , scraper flat 25 cm , scriber 15 cm , spanner d.e. set of 12 pieces 6mm to 32mm , spanner, adjustable 15cm , spanner, ring set of 12 metric sizes 6 to 32 mm. , spanners socket with speed handle, t-bar, ratchet and universal 28 pcs , stud remover with socket handle , tyre pressure gauge with holding nipple with flexible nozzle , work bench 250 x 120 x 60 cm with 4 vices 12cm jaw , refractometer , arbor press hand operated 2-ton capacity , pneumatic rivet gun with standard accessories - automobile group iti items boq | quantity - 94
The tender document is a Request for Proposal (RFP) for selecting a bidder for the Design build finance operate and transfer of cement grinding units. It outlines the terms and conditions for a long-term agreement to construct and operate a cement grinding unit on a Design, Build, Finance, Operate, and Transfer (DBFOT) basis.
Agreement Duration : The agreement is valid for 30 years from the Scheduled Commercial Operation Date (SCOD).
Grant of Concession : The Owner grants the Concessionaire the right to access the project land and perform the scope of work.
Scope of Work : Includes designing, financing, construction, commissioning, stabilization, manufacturing of cement, operation and maintenance of project assets, and packaging and delivery of cement.
Raw Materials and Utilities : The Owner is responsible for providing raw materials and electricity.
Obligations of Concessionaire : Compliance with all applicable laws, maintaining safety standards, and ensuring the project assets meet performance parameters.
Commissioning and Stabilization : Detailed timelines and conditions for commissioning and stabilizing the grinding unit.
Conversion Charges : Payment terms for the conversion charges based on the lowest cost bid accepted by the Owner.
Liquidated Damages : Provisions for delay liquidated damages and shortfall liquidated damages.
Termination : Conditions under which the agreement can be terminated by either party and the consequences of termination.
Dispute Resolution : Any disputes arising under the agreement shall be resolved through arbitration.
Specifications and Standards : As per Ambuja standards
Annual Contracted Quantity of Cement
KPIs of Cement : Key KPIs of cement to be maintained
This document provides a comprehensive framework for the Concessionaire to develop and operate the cement grinding unit, ensuring compliance with all legal, technical, and operational requirements.
Eligibility Criteria - Download