corrigendum : supply of - control line 5 k, roll of 700 feet length , 38 control line 3.5 k , 14" x 14" od tube union , 12" x 12" npt nipple , female tee (12" x 12" x 12" ) npt , male connector 14" tube x 14" npt pin , 14" tube cap (pin type) , 14" tube plug (box type) , male connector 14" tube x 12" npt pin , male connector 34" npt pin x 14" tube , ferrule lock for 14" tube , 12" needle valve , needle valves 14" 5k , 38 x 38" od tube union , 38 tube plug ( pin type) , male connector 38" npt pin x 38" tube , ferrule lock for 38" tube , 38" ss strap (roll) , 38" buckles (box) , banding tool , control line tube cutter , cutting wheel for tube cutter - | quantity - 224130
The tender document is a Request for Proposal (RFP) for selecting a bidder for the Design build finance operate and transfer of cement grinding units. It outlines the terms and conditions for a long-term agreement to construct and operate a cement grinding unit on a Design, Build, Finance, Operate, and Transfer (DBFOT) basis.
Agreement Duration : The agreement is valid for 30 years from the Scheduled Commercial Operation Date (SCOD).
Grant of Concession : The Owner grants the Concessionaire the right to access the project land and perform the scope of work.
Scope of Work : Includes designing, financing, construction, commissioning, stabilization, manufacturing of cement, operation and maintenance of project assets, and packaging and delivery of cement.
Raw Materials and Utilities : The Owner is responsible for providing raw materials and electricity.
Obligations of Concessionaire : Compliance with all applicable laws, maintaining safety standards, and ensuring the project assets meet performance parameters.
Commissioning and Stabilization : Detailed timelines and conditions for commissioning and stabilizing the grinding unit.
Conversion Charges : Payment terms for the conversion charges based on the lowest cost bid accepted by the Owner.
Liquidated Damages : Provisions for delay liquidated damages and shortfall liquidated damages.
Termination : Conditions under which the agreement can be terminated by either party and the consequences of termination.
Dispute Resolution : Any disputes arising under the agreement shall be resolved through arbitration.
Specifications and Standards : As per Ambuja standards
Annual Contracted Quantity of Cement
KPIs of Cement : Key KPIs of cement to be maintained
This document provides a comprehensive framework for the Concessionaire to develop and operate the cement grinding unit, ensuring compliance with all legal, technical, and operational requirements.