supply of - cordless electric drill machine , gi pipe bending machine , pvc pipe bending spring , brake test arrangement with two spring balance rating , series test lamp , bus bar with brackets , rcc pole with accessories , ohm meter series type portable box type , ohm meter shunt type portable box type , multifunction meter , kilo wattmeter analog , magnetic flux meter , g. auto transformer type , function generator , discrete component trainer , bldc motor with controller , servo motor with resolver , pmsm with controller , mppt based charge controller , impulse relay , dusk and dawn switch , manual motor coil winding machine , shaded pole motor , compression testing gauge , engineers stethoscope , files assorted sizes and types , hammer chipping , radiator pressure cap , starter motor axial type, and co-axial type , automotive water pump for dimantaling assembling , working model of air brake assembaly , alternator assembly used for lmv , cut section of cross ply and radial tyres , cut section working model of automatic transmission gear box , cut section working model of , demonstration board of mpfi system , electric assisted power steering , tandem master cylinder with , tyre and split rim wheel assembly , working model of torque converter , arbor press hand operated , spring tension tester , tube tyre vulcanizing machine 220 v - mmv and et tools equipment | quantity - 56
The tender document is a Request for Proposal (RFP) for selecting a bidder for the Design build finance operate and transfer of cement grinding units. It outlines the terms and conditions for a long-term agreement to construct and operate a cement grinding unit on a Design, Build, Finance, Operate, and Transfer (DBFOT) basis.
Agreement Duration : The agreement is valid for 30 years from the Scheduled Commercial Operation Date (SCOD).
Grant of Concession : The Owner grants the Concessionaire the right to access the project land and perform the scope of work.
Scope of Work : Includes designing, financing, construction, commissioning, stabilization, manufacturing of cement, operation and maintenance of project assets, and packaging and delivery of cement.
Raw Materials and Utilities : The Owner is responsible for providing raw materials and electricity.
Obligations of Concessionaire : Compliance with all applicable laws, maintaining safety standards, and ensuring the project assets meet performance parameters.
Commissioning and Stabilization : Detailed timelines and conditions for commissioning and stabilizing the grinding unit.
Conversion Charges : Payment terms for the conversion charges based on the lowest cost bid accepted by the Owner.
Liquidated Damages : Provisions for delay liquidated damages and shortfall liquidated damages.
Termination : Conditions under which the agreement can be terminated by either party and the consequences of termination.
Dispute Resolution : Any disputes arising under the agreement shall be resolved through arbitration.
Specifications and Standards : As per Ambuja standards
Annual Contracted Quantity of Cement
KPIs of Cement : Key KPIs of cement to be maintained
This document provides a comprehensive framework for the Concessionaire to develop and operate the cement grinding unit, ensuring compliance with all legal, technical, and operational requirements.
Eligibility Criteria - Download