supply of - hexagonal bar , anti spatter spry can , arc cable multi cored copper , brass filler road , bronze electrode , cas iron flat , ccms electrode , ccms filler road , coolant , copper pipe , cotton waste , counter shrinking tool , cutting oil , die penetrant test kit , distilled water , drill bit , engine oil , grease , grooving tool , h.s.s hand hacksaw blade , hand shield plain glass , hnad sield dark glass , laping paste , lathe tool bit , leather hand sleeves , leather lag guards , lubricating oil , m.s angle , m.s channel , m.s flat , m.s pipe , m.s pipe , m.s round bar , m.s sheet , m.s square bar , machine lublication oil , marking media prussian blue paste , oil lathe machine , power hackshaw , s.s electrode , s.s sheet , s.s. wire brushes , safty boots for welder , sprak lighter , v tool - supply of raw materials for iti boq | quantity - 2462
The tender document is a Request for Proposal (RFP) for selecting a bidder for the Design build finance operate and transfer of cement grinding units. It outlines the terms and conditions for a long-term agreement to construct and operate a cement grinding unit on a Design, Build, Finance, Operate, and Transfer (DBFOT) basis.
Agreement Duration : The agreement is valid for 30 years from the Scheduled Commercial Operation Date (SCOD).
Grant of Concession : The Owner grants the Concessionaire the right to access the project land and perform the scope of work.
Scope of Work : Includes designing, financing, construction, commissioning, stabilization, manufacturing of cement, operation and maintenance of project assets, and packaging and delivery of cement.
Raw Materials and Utilities : The Owner is responsible for providing raw materials and electricity.
Obligations of Concessionaire : Compliance with all applicable laws, maintaining safety standards, and ensuring the project assets meet performance parameters.
Commissioning and Stabilization : Detailed timelines and conditions for commissioning and stabilizing the grinding unit.
Conversion Charges : Payment terms for the conversion charges based on the lowest cost bid accepted by the Owner.
Liquidated Damages : Provisions for delay liquidated damages and shortfall liquidated damages.
Termination : Conditions under which the agreement can be terminated by either party and the consequences of termination.
Dispute Resolution : Any disputes arising under the agreement shall be resolved through arbitration.
Specifications and Standards : As per Ambuja standards
Annual Contracted Quantity of Cement
KPIs of Cement : Key KPIs of cement to be maintained
This document provides a comprehensive framework for the Concessionaire to develop and operate the cement grinding unit, ensuring compliance with all legal, technical, and operational requirements.
Eligibility Criteria - Download