supply of - insulator egg type including hardware fitting , insulator suspension type including hardware fitting , brake test arrangement , earth electrode primary , earth electrode secondary , cables, as per given in spec list , bus bar with brackets 1 mtr , series type ohm meter , shunt type ohm meter , wheatstone bridge , variable auto transformer , ac starter resistance type starter , star delta strater soft starter , function generator , dc compound motor , motor ac single phase , stepper motor with digital control , shaded pole motor , single phase smart energy meter , three phase smart energy meter , wiring board on stand , plumb bob , set of rowel punch , conduit pipe cutting and threading machines , conduit pipe bending machine, suitable , autotransformer , solid state solar based single phase energy meter , single phase kwh meter analog , single phase kwh meter digital , three phase kwh meter analog , three phase kwh meter digital , magnetic flux meter , bar magnet , insulators including hardware fitting , knife switch dpdt fitted with fuse terminals , knife switch tpdt fitted with fuse terminals , earth electrode primary electrode , bus bar with brackets , rubber gloves , rechargeable battery , motion detector , automatic reverse forward starter , soft starter , solar street light lamp set , d.c. shunt motor , washing machine , dmx controller , demonstration table , metal rack , blackboard with easel - iti thangadh boq 2 electrical | quantity - 159
The tender document is a Request for Proposal (RFP) for selecting a bidder for the Design build finance operate and transfer of cement grinding units. It outlines the terms and conditions for a long-term agreement to construct and operate a cement grinding unit on a Design, Build, Finance, Operate, and Transfer (DBFOT) basis.
Agreement Duration : The agreement is valid for 30 years from the Scheduled Commercial Operation Date (SCOD).
Grant of Concession : The Owner grants the Concessionaire the right to access the project land and perform the scope of work.
Scope of Work : Includes designing, financing, construction, commissioning, stabilization, manufacturing of cement, operation and maintenance of project assets, and packaging and delivery of cement.
Raw Materials and Utilities : The Owner is responsible for providing raw materials and electricity.
Obligations of Concessionaire : Compliance with all applicable laws, maintaining safety standards, and ensuring the project assets meet performance parameters.
Commissioning and Stabilization : Detailed timelines and conditions for commissioning and stabilizing the grinding unit.
Conversion Charges : Payment terms for the conversion charges based on the lowest cost bid accepted by the Owner.
Liquidated Damages : Provisions for delay liquidated damages and shortfall liquidated damages.
Termination : Conditions under which the agreement can be terminated by either party and the consequences of termination.
Dispute Resolution : Any disputes arising under the agreement shall be resolved through arbitration.
Specifications and Standards : As per Ambuja standards
Annual Contracted Quantity of Cement
KPIs of Cement : Key KPIs of cement to be maintained
This document provides a comprehensive framework for the Concessionaire to develop and operate the cement grinding unit, ensuring compliance with all legal, technical, and operational requirements.