supply of - jack hyd lifting 8 ton closed height 240 , nipple grease conical head angled 1 8 br , nipplegrease button head 1 8 bsp x 9mm , cap tyre valve type head 880z tr vc 2 , filter fuel , assy canopy , cylinder assy master with booster , injector assy fuel , generator assy , motor assy starting , spring assy front , injector for 135 kw bs iii vp 37 , ram hydraulic ram assy , jerrican 20 liters , halogen bulb h4 24v 70 75 w p45 , first aid kit , de spanner 12x13 metric , halogen bulb h4 24v 60 65w p45 t capt fo , shovel gs mk iii , filter insert , speedometer , glass , filter , orange beacon 025205906 , turbocharger , assy clutch disc pressure plate , clutch master cylinder 19 05 dia , armature assy , assy brake master cyl 31 8x75 strokes , assy master cylinder 25 4 dia , separater fuel water , assy rear brake actuator scl , plate clutch disc clutch , starter motor 24 volts , assy clutch master cylinder , master cylinder repair kit , 352 dia clutch disc assy 1 75 spline , relay 24v , rubber hose radiator to engine , assy 310 dia clutch disc , cartridge lub oil filter , assy spring brake actuator type 16 56 , assy blade wiper , repair kit hyd brake wheel cyl front , major repair kit air compressor , slave cylinder , flasher 24 v , speedo cable jis 3000 mm , pump water , filter element tc , element fuel water separator - boq bid | quantity - 2625
The tender document is a Request for Proposal (RFP) for selecting a bidder for the Design build finance operate and transfer of cement grinding units. It outlines the terms and conditions for a long-term agreement to construct and operate a cement grinding unit on a Design, Build, Finance, Operate, and Transfer (DBFOT) basis.
Agreement Duration : The agreement is valid for 30 years from the Scheduled Commercial Operation Date (SCOD).
Grant of Concession : The Owner grants the Concessionaire the right to access the project land and perform the scope of work.
Scope of Work : Includes designing, financing, construction, commissioning, stabilization, manufacturing of cement, operation and maintenance of project assets, and packaging and delivery of cement.
Raw Materials and Utilities : The Owner is responsible for providing raw materials and electricity.
Obligations of Concessionaire : Compliance with all applicable laws, maintaining safety standards, and ensuring the project assets meet performance parameters.
Commissioning and Stabilization : Detailed timelines and conditions for commissioning and stabilizing the grinding unit.
Conversion Charges : Payment terms for the conversion charges based on the lowest cost bid accepted by the Owner.
Liquidated Damages : Provisions for delay liquidated damages and shortfall liquidated damages.
Termination : Conditions under which the agreement can be terminated by either party and the consequences of termination.
Dispute Resolution : Any disputes arising under the agreement shall be resolved through arbitration.
Specifications and Standards : As per Ambuja standards
Annual Contracted Quantity of Cement
KPIs of Cement : Key KPIs of cement to be maintained
This document provides a comprehensive framework for the Concessionaire to develop and operate the cement grinding unit, ensuring compliance with all legal, technical, and operational requirements.