corrigendum : supply of - lpp 2730g breaker plate end piece with fasteners part no. 3-273-a-024 for ri , breaker plate intermediate with fasteners part no.3-273-a-038 for ring gr , screen plate small opening end piece with fasteners part no.2-367-a-022 , screen plate small opening intermediate with fasteners part no.2-367- a-028 fo , screen plate large opening end piece with fasteners part no.2-367-a-020 for ri , screen plate large opening intermediate piece with fasteners part no.2-367-a- , kick off plate with fasteners part no. 2-367-a-059 for ring granulator 733 of , upper breaker plate with fasteners for ring granulator 733 of 500mw coal handli , screen plate clamp bar part no.3-273-a-031 for ring granulator 733 of 500mw coal , end disc, mark no.2-367-g-74 for ring granulator 733 , suspension disc, mark no.2-367-f- 61 for ring granulator 733 , rotor shaft with keys, lock nut washer, mark no.1-523-a-25 for ring granulator , complete pillow block assembly held with bearing for ring granulator 733 of 50 , complete pillow block assembly free with bearing for ring granulator 733 of 50 , suspension bar for mcnally crusher rg-733 - lpp 2730g supply of various spares of ring granulator model rg 733 of 500 mw chp at utps | quantity - 80
The tender document is a Request for Proposal (RFP) for selecting a bidder for the Design build finance operate and transfer of cement grinding units. It outlines the terms and conditions for a long-term agreement to construct and operate a cement grinding unit on a Design, Build, Finance, Operate, and Transfer (DBFOT) basis.
Agreement Duration : The agreement is valid for 30 years from the Scheduled Commercial Operation Date (SCOD).
Grant of Concession : The Owner grants the Concessionaire the right to access the project land and perform the scope of work.
Scope of Work : Includes designing, financing, construction, commissioning, stabilization, manufacturing of cement, operation and maintenance of project assets, and packaging and delivery of cement.
Raw Materials and Utilities : The Owner is responsible for providing raw materials and electricity.
Obligations of Concessionaire : Compliance with all applicable laws, maintaining safety standards, and ensuring the project assets meet performance parameters.
Commissioning and Stabilization : Detailed timelines and conditions for commissioning and stabilizing the grinding unit.
Conversion Charges : Payment terms for the conversion charges based on the lowest cost bid accepted by the Owner.
Liquidated Damages : Provisions for delay liquidated damages and shortfall liquidated damages.
Termination : Conditions under which the agreement can be terminated by either party and the consequences of termination.
Dispute Resolution : Any disputes arising under the agreement shall be resolved through arbitration.
Specifications and Standards : As per Ambuja standards
Annual Contracted Quantity of Cement
KPIs of Cement : Key KPIs of cement to be maintained
This document provides a comprehensive framework for the Concessionaire to develop and operate the cement grinding unit, ensuring compliance with all legal, technical, and operational requirements.