corrigendum : supply of - lpp 3000g mcrp card suitable for 95 kv dc , 800 ma dc. , capacitor 0.22 mfd 10 percent, 800 v ac paper polystrene dielectric for 95kvp dc , gt 1 2 3 pair overvoltage protector for sparkover voltage 240 360 v dc , capacitor 1.0 mfd 10percent, 800 1000 v across power contactor for 95kvp dc ecp , capacitor 0.1 mfd 10 percent, 250v for relay coils for 95kvp dc ecp panel of hvr , surge circuit resistor for esp xmer 12 ohm 10percent, 200 watts, wire wound non in , resistor r17 r18 for esp system10k ohm 05percent, 25 wattswir , resistor wire wound, vte 22 ohm 10percent,25 watts, type c950511 for esp xmer , capacitor ,2.2 micro f,400 v dc advance make , ct 300 1 1 amp, 2core, 10 va each 1 no-oor air cooled resin cast, ring type, acc , capacitor 10 mfd 10percent 600v , resistors 1.2k plus 5percent 10w , resistors 2k plus 5percent 25w , relay 49qtx type 3r-3-24 for oil temp for hvr transformer , relay 63tx type 3r-3-24 for buchholz for hvr transformer , high voltage rectifier module complete stack for esp hvr transformer , assembly of gt2, gt4 and shr for esp hvr transformer , fixed type shunt resistor 2 ohms, 40watts of high voltage rectiformer , thyristor of transformer rectifier controller bht p55 for esp hvr transformer - lpp 2704g supply of electrical spares for ec panel hvr transformer for esp of 500mw | quantity - 167
The tender document is a Request for Proposal (RFP) for selecting a bidder for the Design build finance operate and transfer of cement grinding units. It outlines the terms and conditions for a long-term agreement to construct and operate a cement grinding unit on a Design, Build, Finance, Operate, and Transfer (DBFOT) basis.
Agreement Duration : The agreement is valid for 30 years from the Scheduled Commercial Operation Date (SCOD).
Grant of Concession : The Owner grants the Concessionaire the right to access the project land and perform the scope of work.
Scope of Work : Includes designing, financing, construction, commissioning, stabilization, manufacturing of cement, operation and maintenance of project assets, and packaging and delivery of cement.
Raw Materials and Utilities : The Owner is responsible for providing raw materials and electricity.
Obligations of Concessionaire : Compliance with all applicable laws, maintaining safety standards, and ensuring the project assets meet performance parameters.
Commissioning and Stabilization : Detailed timelines and conditions for commissioning and stabilizing the grinding unit.
Conversion Charges : Payment terms for the conversion charges based on the lowest cost bid accepted by the Owner.
Liquidated Damages : Provisions for delay liquidated damages and shortfall liquidated damages.
Termination : Conditions under which the agreement can be terminated by either party and the consequences of termination.
Dispute Resolution : Any disputes arising under the agreement shall be resolved through arbitration.
Specifications and Standards : As per Ambuja standards
Annual Contracted Quantity of Cement
KPIs of Cement : Key KPIs of cement to be maintained
This document provides a comprehensive framework for the Concessionaire to develop and operate the cement grinding unit, ensuring compliance with all legal, technical, and operational requirements.
Eligibility Criteria - Download