corrigendum : supply of manufacturing and supply of fittings for level crossing for 60kg rails on wider base ps csleepers as per rdso drg. no. t-8983. (check rail assembly for level xing on psc sleeper wi th 60 kg (uic) / 60e1 running rail and 52 kg check rail for 25t axle load b.g). note: one set c omprises of the following :- i) c.i. brackets to rdso%u2019s drg. no. t-8985 & spn. irs-t-10 = 2 nos. ii) c.i. distance brackets to rdso%u2019s drg. no. t-4785 & spn. irs-t-10 = 2 nos. iii) 22mm dia. bol ts nuts to rdso%u2019s drg. no. t-11550 & spn. irs-t-23 = 2 nos. iv) plate screws to rdso%u2019 s drg. no. t-3913 & spn. irs-t-16 = 4 nos. v) single coil spring washer to rdso drg. no. t-10773=04 nos [ warranty period: 30 months after the date of delivery ] ] - fittings for level crossing
The tender document is a Request for Proposal (RFP) for selecting a bidder for the Design build finance operate and transfer of cement grinding units. It outlines the terms and conditions for a long-term agreement to construct and operate a cement grinding unit on a Design, Build, Finance, Operate, and Transfer (DBFOT) basis.
Agreement Duration : The agreement is valid for 30 years from the Scheduled Commercial Operation Date (SCOD).
Grant of Concession : The Owner grants the Concessionaire the right to access the project land and perform the scope of work.
Scope of Work : Includes designing, financing, construction, commissioning, stabilization, manufacturing of cement, operation and maintenance of project assets, and packaging and delivery of cement.
Raw Materials and Utilities : The Owner is responsible for providing raw materials and electricity.
Obligations of Concessionaire : Compliance with all applicable laws, maintaining safety standards, and ensuring the project assets meet performance parameters.
Commissioning and Stabilization : Detailed timelines and conditions for commissioning and stabilizing the grinding unit.
Conversion Charges : Payment terms for the conversion charges based on the lowest cost bid accepted by the Owner.
Liquidated Damages : Provisions for delay liquidated damages and shortfall liquidated damages.
Termination : Conditions under which the agreement can be terminated by either party and the consequences of termination.
Dispute Resolution : Any disputes arising under the agreement shall be resolved through arbitration.
Specifications and Standards : As per Ambuja standards
Annual Contracted Quantity of Cement
KPIs of Cement : Key KPIs of cement to be maintained
This document provides a comprehensive framework for the Concessionaire to develop and operate the cement grinding unit, ensuring compliance with all legal, technical, and operational requirements.