supply of - marking table , v-block pair with clamps , wooden handle forged soldering iron copper bit. , different profile gauges , knurling tool , machine maintenance manual for lathe, pedestal grinder, drill machine, power saw , dowel pin , standard tap screws , caps screws , drill gauges letter drill gauge , slip-on forged steel flange , damaged old spur gear , v-belt and flat belt , packing gasket , washer, clutch, keys, jib, cotter and circlip , bearing different types each type of , flat headed hammers with handle. , snip bent left cut , stake hatchet with leg. , stake grooving 1 , slip gauge as johnson metric set. , arc welding table all metal top with positioner. , gas welding table with positioner with fire bricks , welding torch tips of different sizes for oxy - acetylene gas welding - iti thangadh boq 3 mechanical | quantity - 40
The tender document is a Request for Proposal (RFP) for selecting a bidder for the Design build finance operate and transfer of cement grinding units. It outlines the terms and conditions for a long-term agreement to construct and operate a cement grinding unit on a Design, Build, Finance, Operate, and Transfer (DBFOT) basis.
Agreement Duration : The agreement is valid for 30 years from the Scheduled Commercial Operation Date (SCOD).
Grant of Concession : The Owner grants the Concessionaire the right to access the project land and perform the scope of work.
Scope of Work : Includes designing, financing, construction, commissioning, stabilization, manufacturing of cement, operation and maintenance of project assets, and packaging and delivery of cement.
Raw Materials and Utilities : The Owner is responsible for providing raw materials and electricity.
Obligations of Concessionaire : Compliance with all applicable laws, maintaining safety standards, and ensuring the project assets meet performance parameters.
Commissioning and Stabilization : Detailed timelines and conditions for commissioning and stabilizing the grinding unit.
Conversion Charges : Payment terms for the conversion charges based on the lowest cost bid accepted by the Owner.
Liquidated Damages : Provisions for delay liquidated damages and shortfall liquidated damages.
Termination : Conditions under which the agreement can be terminated by either party and the consequences of termination.
Dispute Resolution : Any disputes arising under the agreement shall be resolved through arbitration.
Specifications and Standards : As per Ambuja standards
Annual Contracted Quantity of Cement
KPIs of Cement : Key KPIs of cement to be maintained
This document provides a comprehensive framework for the Concessionaire to develop and operate the cement grinding unit, ensuring compliance with all legal, technical, and operational requirements.
Eligibility Criteria - Download