supply of - neon tester , three phase energy meter analog , watt meter dynamo meter type , meter reading instrument or mri , conduit pipe cutting and threading machines adjustable for 15 mm to 30 mm , crimping tool for crimping 16 sq mm to 95 sq.mm , crimping tool plier 9 inch hex series , wire cutter and stripper , wiring board on stand , screw driver , foot print grip , scissors electrician , scissors blade electrician , contactor with auxiliary contacts , limit switch , cut out relays , over load relays , under voltage relays , insulator pin type including hardware fitting , insulator shackle types including hardware fitting , insulator egg type including hardware fitting , insulator suspension type including hardware fitting , earth copper plate , earth electrode primary electrode , earth electrode secondary cu strip , residual current cuircuit breaker or rccb 25 amp , rechargeable battery , solar panels , solar charge controller with manual switch for day lighting , motion detector , electric kettle , electric heater , table fan a.c. , manual motor coil winding machine with step arbor , table for demonstration , electrician screw driver , hand operated crimping tool , screwdriver insulated , knife double bladed electrician 100 mm , cordless electric drill machine , laboratory type induction coil , series test lamp , miniature circuit breaker , elcb , rcc pole with accessories and materials 6 mtr , digital wattmeter , tachometer analog type , ac starters star delta starter- manual , potential transformer , smart meter 1 phase - smart energy meter with overload, overcurrent, tempering, magnetic interference protection - electrical tools equipments machinary | quantity - 198
The tender document is a Request for Proposal (RFP) for selecting a bidder for the Design build finance operate and transfer of cement grinding units. It outlines the terms and conditions for a long-term agreement to construct and operate a cement grinding unit on a Design, Build, Finance, Operate, and Transfer (DBFOT) basis.
Agreement Duration : The agreement is valid for 30 years from the Scheduled Commercial Operation Date (SCOD).
Grant of Concession : The Owner grants the Concessionaire the right to access the project land and perform the scope of work.
Scope of Work : Includes designing, financing, construction, commissioning, stabilization, manufacturing of cement, operation and maintenance of project assets, and packaging and delivery of cement.
Raw Materials and Utilities : The Owner is responsible for providing raw materials and electricity.
Obligations of Concessionaire : Compliance with all applicable laws, maintaining safety standards, and ensuring the project assets meet performance parameters.
Commissioning and Stabilization : Detailed timelines and conditions for commissioning and stabilizing the grinding unit.
Conversion Charges : Payment terms for the conversion charges based on the lowest cost bid accepted by the Owner.
Liquidated Damages : Provisions for delay liquidated damages and shortfall liquidated damages.
Termination : Conditions under which the agreement can be terminated by either party and the consequences of termination.
Dispute Resolution : Any disputes arising under the agreement shall be resolved through arbitration.
Specifications and Standards : As per Ambuja standards
Annual Contracted Quantity of Cement
KPIs of Cement : Key KPIs of cement to be maintained
This document provides a comprehensive framework for the Concessionaire to develop and operate the cement grinding unit, ensuring compliance with all legal, technical, and operational requirements.