supply of - paper a4 size , paper legal size , white board marker blue and black soluble , envelop 16 x 12 with cloth , envelop legal size 14 x 10 with cloth , envelop a4 size 12 x 10 with cloth , envelop dak dispatch 12 x 5 , envelop do size , printed file cover , printed file cover white , register 100 pages 2 qr , register 200 pages 4 qr , register 400 pages 6qr , pen uniball blue offrs use , pen uniball red offrs use , pen clerical use blue , pen clerical use red , pen clerical use black , binder clip 25 mm , binder clip 19 mm , flag multi colour , pencil , eraser , sharpener , tag small size , tag big size , highlighters all colour , sketch pen blue and black colour , permanent marker blue and black , glue stick 25 gm , transparent tape 1 , transparent tape 2 , packing tape brown colour 2 , stapler pin big size 24 no , stapler pin med size 10 no , u clip plastic coated 35 mm , paper cutter 19 mm , pencil cell aaa duracell , pencil cell aa , whitener pen , pen v5 blue , pen v7 green , correction tape , gift packing paper , gift packing readymade flower , fevicol 1 ltr , stapler big size , stapler med size , talc sheet , drawing sheet - | quantity - 2228
The tender document is a Request for Proposal (RFP) for selecting a bidder for the Design build finance operate and transfer of cement grinding units. It outlines the terms and conditions for a long-term agreement to construct and operate a cement grinding unit on a Design, Build, Finance, Operate, and Transfer (DBFOT) basis.
Agreement Duration : The agreement is valid for 30 years from the Scheduled Commercial Operation Date (SCOD).
Grant of Concession : The Owner grants the Concessionaire the right to access the project land and perform the scope of work.
Scope of Work : Includes designing, financing, construction, commissioning, stabilization, manufacturing of cement, operation and maintenance of project assets, and packaging and delivery of cement.
Raw Materials and Utilities : The Owner is responsible for providing raw materials and electricity.
Obligations of Concessionaire : Compliance with all applicable laws, maintaining safety standards, and ensuring the project assets meet performance parameters.
Commissioning and Stabilization : Detailed timelines and conditions for commissioning and stabilizing the grinding unit.
Conversion Charges : Payment terms for the conversion charges based on the lowest cost bid accepted by the Owner.
Liquidated Damages : Provisions for delay liquidated damages and shortfall liquidated damages.
Termination : Conditions under which the agreement can be terminated by either party and the consequences of termination.
Dispute Resolution : Any disputes arising under the agreement shall be resolved through arbitration.
Specifications and Standards : As per Ambuja standards
Annual Contracted Quantity of Cement
KPIs of Cement : Key KPIs of cement to be maintained
This document provides a comprehensive framework for the Concessionaire to develop and operate the cement grinding unit, ensuring compliance with all legal, technical, and operational requirements.
Eligibility Criteria - Download