supply of - pilot pen v7 blue ,1 inch tape transparent ,half tape transparent ,2 inch tape transparent ,packing tape ,slide sheet ,drawing sheet (all colour),ivory sheet ,"paper cutter blade ,(sdi 1404h 18mm)",paper cutter (steel),cd marker blue ,cd marker black,cd marker red ,cd marker green,staedtler permanent ohp pen 0.6 mm ,fevistick big (25 gm),florescent paper orange, red, yellow, green, pink & blue ,photo paper ,spiral rings small, medium & large,spiral binding sheets blue and transparant ,ball pen (blue & black),pencil (apsara),whit board marker black, blue, red & green ,half tape nichiban red, black, blue & green ,double side tape,stapler medium and small type,fevicol (sr 998) 500g,pin remover ,sharpener & eraser ,lamination sheet a4,go classic lamination roll 12 inc and 9 inch,drawing roll,ribbon 1 inch & half inch red, blue, gold, silver & green,decration flower small and big all colour ,gift packing paper blue, red, gold & green ,scissor,permanent board marker blue, green, red, black,writing brush flat all size (2,4,6,8,12 and 1/2),ohp soluble marker (2400) ,tape dispenser ,gun stapler ,stapler pin (size 24/6, 23/10, 23/06 and 10 no),usb port adaptor for laser pointer charging (portronics),chair polish (1 ltr),geometry box ,sketch pen (luxor sign pen) (blue, red, black, green),nkt talc roll ,paper pin ,thumb pin (golden),marking thumb pin all colour,water colour (acrylic) all colour,highlighter ,small hammer (150g),steel poker ,board stand,omega clip board (white),white board, - purchase of sty items | quantity - 722
The tender document is a Request for Proposal (RFP) for selecting a bidder for the Design build finance operate and transfer of cement grinding units. It outlines the terms and conditions for a long-term agreement to construct and operate a cement grinding unit on a Design, Build, Finance, Operate, and Transfer (DBFOT) basis.
Agreement Duration : The agreement is valid for 30 years from the Scheduled Commercial Operation Date (SCOD).
Grant of Concession : The Owner grants the Concessionaire the right to access the project land and perform the scope of work.
Scope of Work : Includes designing, financing, construction, commissioning, stabilization, manufacturing of cement, operation and maintenance of project assets, and packaging and delivery of cement.
Raw Materials and Utilities : The Owner is responsible for providing raw materials and electricity.
Obligations of Concessionaire : Compliance with all applicable laws, maintaining safety standards, and ensuring the project assets meet performance parameters.
Commissioning and Stabilization : Detailed timelines and conditions for commissioning and stabilizing the grinding unit.
Conversion Charges : Payment terms for the conversion charges based on the lowest cost bid accepted by the Owner.
Liquidated Damages : Provisions for delay liquidated damages and shortfall liquidated damages.
Termination : Conditions under which the agreement can be terminated by either party and the consequences of termination.
Dispute Resolution : Any disputes arising under the agreement shall be resolved through arbitration.
Specifications and Standards : As per Ambuja standards
Annual Contracted Quantity of Cement
KPIs of Cement : Key KPIs of cement to be maintained
This document provides a comprehensive framework for the Concessionaire to develop and operate the cement grinding unit, ensuring compliance with all legal, technical, and operational requirements.