supply of pipe 32 bore for boxnhl (bmbs) as per rdso's drg. no. wd-09034-s-12, alt-8, item no.1, fitted with item no. 16 & 17. specificat ion as per rdso spec. no. 04-abr-2019 (rev. 02 of dec. 2019). material as per rdso letter no. mw/apb dt. 22/05/2020- stainless steel to ast m-a312 schedule 40s gr. tp 304 (erw). uvam item ref. : 3100389--component of graduated release compressed air brake equipments for frei ght & coaching stock , sub item : 3100389007--sub item:pipes & joints for air brakes [ warranty period: 30 months after the date of delivery ] ] sr. section engineer wagon shop dahod, - 1. pipe 32 bore. 2.pipe 32mm
The tender document is a Request for Proposal (RFP) for selecting a bidder for the Design build finance operate and transfer of cement grinding units. It outlines the terms and conditions for a long-term agreement to construct and operate a cement grinding unit on a Design, Build, Finance, Operate, and Transfer (DBFOT) basis.
Agreement Duration : The agreement is valid for 30 years from the Scheduled Commercial Operation Date (SCOD).
Grant of Concession : The Owner grants the Concessionaire the right to access the project land and perform the scope of work.
Scope of Work : Includes designing, financing, construction, commissioning, stabilization, manufacturing of cement, operation and maintenance of project assets, and packaging and delivery of cement.
Raw Materials and Utilities : The Owner is responsible for providing raw materials and electricity.
Obligations of Concessionaire : Compliance with all applicable laws, maintaining safety standards, and ensuring the project assets meet performance parameters.
Commissioning and Stabilization : Detailed timelines and conditions for commissioning and stabilizing the grinding unit.
Conversion Charges : Payment terms for the conversion charges based on the lowest cost bid accepted by the Owner.
Liquidated Damages : Provisions for delay liquidated damages and shortfall liquidated damages.
Termination : Conditions under which the agreement can be terminated by either party and the consequences of termination.
Dispute Resolution : Any disputes arising under the agreement shall be resolved through arbitration.
Specifications and Standards : As per Ambuja standards
Annual Contracted Quantity of Cement
KPIs of Cement : Key KPIs of cement to be maintained
This document provides a comprehensive framework for the Concessionaire to develop and operate the cement grinding unit, ensuring compliance with all legal, technical, and operational requirements.
Eligibility Criteria - Download