supply of - rocker shaft assly complete , setting bush , spilt bush , button for injector yoke , brass nut , washer , vr toe , gasket , oil seal 115x140x16 , oil seal , rubber bush clip , special banjo bolt lo supply to pump , starter ring , washer for sump screw , hose clamp ss tbots and n4 nut 115mm , hose , copper washer inj , compression ring for gas outlet manifold , fuel pipe line , cylinder liner , injector yoke , drain plug with magnet and o ring , thrust washer , temp sensor and gauge assy 12v 40 130 , bolt for mb cap , hose clip , washer fip gear , washer for fip set screw , primary element , secondary element , fuel pipe return m12x105 male plug , joint for inlet manifold , joint for air inlet manifold , sealing ring fuel filter , drain pipe sump to pump , flexible pipe , water temp switch 95 3 deg yankee , jupiter warm drive clamp603 65mm , fuel fileter kit 1.1 ltr , thrust washer cam shaft , lo supply hose fip , cyl head bolt , hose by pass , water pump assy , spacer ex manifold , banjo bolt for piston cooling nozzle , banjo bolt m14x1.5 thread , composite washer for banjo bolt , joint for adoptor , rubber hose , con rod assy , set bolt m8x1.25x30 8.8 , set bolt , set bolt m8x105x608.8 , set bolt for front cover , set bolt engine mounting , set screw , set screw expansion bellow , nut 8m , nut m 10 x 1.5 gr 8 , stud fuel pump , sump screw , bolt for ex manifold , dowel , banjo bolt , planner washer , washerplain , radiator hose clip 22mm , worm drive hose clip , spring dowell pin cylinder block , radiator hose clip 35mm , set bolt m8x1.25x100 8.8 front cover , lock nut , key , spring washer , piston cooling nozzle assy , gasket cyl head 6r1080 ta , cyl head assy , high pressure pipeline complete set , pipe rkr arm , joint for rocker cover , joint rocker cover , lub oil drain pipe , set of joints , set of o ring , fip , joint for air pipe , set of washer , set of hoses , fuel pipe filter to pump , fuel pipe filter to fip , cam shaft bush , centrfugal filter , indicator air cleaner , air cleaner element koel 6r 1080 ta, 100 kva , bearing main kir 6r1080 std , ss joint exh manifold , thrust washer set of inner and outer pairs , pre fuel filter element , set boltm8x1.25x358.8 , plain machined washerm6 , crank shaft assy - proc of kerloskar dg set spares 111 lines | quantity - 736
The tender document is a Request for Proposal (RFP) for selecting a bidder for the Design build finance operate and transfer of cement grinding units. It outlines the terms and conditions for a long-term agreement to construct and operate a cement grinding unit on a Design, Build, Finance, Operate, and Transfer (DBFOT) basis.
Agreement Duration : The agreement is valid for 30 years from the Scheduled Commercial Operation Date (SCOD).
Grant of Concession : The Owner grants the Concessionaire the right to access the project land and perform the scope of work.
Scope of Work : Includes designing, financing, construction, commissioning, stabilization, manufacturing of cement, operation and maintenance of project assets, and packaging and delivery of cement.
Raw Materials and Utilities : The Owner is responsible for providing raw materials and electricity.
Obligations of Concessionaire : Compliance with all applicable laws, maintaining safety standards, and ensuring the project assets meet performance parameters.
Commissioning and Stabilization : Detailed timelines and conditions for commissioning and stabilizing the grinding unit.
Conversion Charges : Payment terms for the conversion charges based on the lowest cost bid accepted by the Owner.
Liquidated Damages : Provisions for delay liquidated damages and shortfall liquidated damages.
Termination : Conditions under which the agreement can be terminated by either party and the consequences of termination.
Dispute Resolution : Any disputes arising under the agreement shall be resolved through arbitration.
Specifications and Standards : As per Ambuja standards
Annual Contracted Quantity of Cement
KPIs of Cement : Key KPIs of cement to be maintained
This document provides a comprehensive framework for the Concessionaire to develop and operate the cement grinding unit, ensuring compliance with all legal, technical, and operational requirements.
Eligibility Criteria - Download