corrigendum : supply of - sc-lc single mode duplex fiber patch cord 10 mtrs , sc-sc single mode duplex fiber patch cord 2 mtrs , sc-lc single mode duplex fiber patch cord 3 mtrs , 1g sfp module , l3 12 x10g multi gig 12xsfp managed lan equipment , stack cable 1 meter , cat6 utp patch cord 10 meter , cat6 utp patch cord 2 meter , 24 -port gigabit poe managed lan equipment power bugdget 380w , insight cloud controller pro 5 year subcription , 2 x 2 dual band wireless-wifi-6 project , 9u 550w x 600d mm wall mount closed rack wall mount closed rack , 6u 550w x 600d mm wall mount closed rack wall mount closed rack , 24 port unloaded patch panel , information outlets , cat6 0.5 mtr. patch cord , 6 core sm fiber , 6u port liu fully loaded , 12u port liu fully loaded , 24u port liu fully loaded , cat6 utp cable , rj45 connector , 1 kva line interactive , 2 kva line online for lan equipment , 2.5 sq mm 3 core flexible copper cable , 15 amp switch socket plus backbox with plate , installation - wifi boq | quantity - 17727
The tender document is a Request for Proposal (RFP) for selecting a bidder for the Design build finance operate and transfer of cement grinding units. It outlines the terms and conditions for a long-term agreement to construct and operate a cement grinding unit on a Design, Build, Finance, Operate, and Transfer (DBFOT) basis.
Agreement Duration : The agreement is valid for 30 years from the Scheduled Commercial Operation Date (SCOD).
Grant of Concession : The Owner grants the Concessionaire the right to access the project land and perform the scope of work.
Scope of Work : Includes designing, financing, construction, commissioning, stabilization, manufacturing of cement, operation and maintenance of project assets, and packaging and delivery of cement.
Raw Materials and Utilities : The Owner is responsible for providing raw materials and electricity.
Obligations of Concessionaire : Compliance with all applicable laws, maintaining safety standards, and ensuring the project assets meet performance parameters.
Commissioning and Stabilization : Detailed timelines and conditions for commissioning and stabilizing the grinding unit.
Conversion Charges : Payment terms for the conversion charges based on the lowest cost bid accepted by the Owner.
Liquidated Damages : Provisions for delay liquidated damages and shortfall liquidated damages.
Termination : Conditions under which the agreement can be terminated by either party and the consequences of termination.
Dispute Resolution : Any disputes arising under the agreement shall be resolved through arbitration.
Specifications and Standards : As per Ambuja standards
Annual Contracted Quantity of Cement
KPIs of Cement : Key KPIs of cement to be maintained
This document provides a comprehensive framework for the Concessionaire to develop and operate the cement grinding unit, ensuring compliance with all legal, technical, and operational requirements.