supply of - screw driver insulated 9 mm x 300 mm , philips screw driver set of 5 pieces 100mm - 300mm , allen screwdriver wrench tool , mini drafter , chisel cold flat 20 mm x 150 mm , file feather edge smooth. 150 mm , file hand second cut. 150 mm , file card. 3 inch x5 inch size , interchangeable ratchet socket set. 12 mm driver,sized10- 32 mm set of 18 socket and attachments. , scraper flat. 150 mm , scraper triangular. 150 mm , scraper half round. 150 mm , drill chuck with key. 12 mm , trammel . 300 mm , mallet. dia 100 mm x 150 mm , aviation snips straight cut. 300 , flat headed hammers with handle , planishing hammer , snip bent left cut. 250 mm , terminal screw driver 75 mm connector , foot print grip 250 mm , pliers flat nose insulated 150 mm , plumb bob 115 grams , hammer cross peen 0.5 kg , hammer ball peen 1.0 kg , rawal tool holder and bit no. 8, 10, 14, and 16 , file - flat - bastard 250 mm , scraper flat- 250 mm , scraper half round - 250 mm , scraper triangular 250 mm , 3 leg bearing puller 6 inch , scriber 150mm double point , multi angle magnetic clamp set metal base 18x10x10cm , set square transparent 20 cm and 2 mm thick with bevelled edges 45 degree . , t-square , telescopic alidade , dumpy level with all accessories - procurement of tools | quantity - 269
The tender document is a Request for Proposal (RFP) for selecting a bidder for the Design build finance operate and transfer of cement grinding units. It outlines the terms and conditions for a long-term agreement to construct and operate a cement grinding unit on a Design, Build, Finance, Operate, and Transfer (DBFOT) basis.
Agreement Duration : The agreement is valid for 30 years from the Scheduled Commercial Operation Date (SCOD).
Grant of Concession : The Owner grants the Concessionaire the right to access the project land and perform the scope of work.
Scope of Work : Includes designing, financing, construction, commissioning, stabilization, manufacturing of cement, operation and maintenance of project assets, and packaging and delivery of cement.
Raw Materials and Utilities : The Owner is responsible for providing raw materials and electricity.
Obligations of Concessionaire : Compliance with all applicable laws, maintaining safety standards, and ensuring the project assets meet performance parameters.
Commissioning and Stabilization : Detailed timelines and conditions for commissioning and stabilizing the grinding unit.
Conversion Charges : Payment terms for the conversion charges based on the lowest cost bid accepted by the Owner.
Liquidated Damages : Provisions for delay liquidated damages and shortfall liquidated damages.
Termination : Conditions under which the agreement can be terminated by either party and the consequences of termination.
Dispute Resolution : Any disputes arising under the agreement shall be resolved through arbitration.
Specifications and Standards : As per Ambuja standards
Annual Contracted Quantity of Cement
KPIs of Cement : Key KPIs of cement to be maintained
This document provides a comprehensive framework for the Concessionaire to develop and operate the cement grinding unit, ensuring compliance with all legal, technical, and operational requirements.
Eligibility Criteria - Download