corrigendum : supply of - secondary stage physics laboratory kit (ncert) (q3) , micro scale chemistry laboratory kit (ncert) (q3) - kit manual, kit box, vernier calipers, screw gauge, spherometer, beam balance, laboratory stand assembly, measuring cylinder, stopwatch with split timeout, inclined plane, steel roller, aluminium roller, helical spring, 20 g slotted weight with hook, 50 g slotted weight with hook, 100 g slotted weight with hook, 500 g slotted weight with hook, solid wooden block for holding beam balance, pulley (s type), steel balls, wooden block with hook, capillary tubes, bob with hook, plane mirror strips with scale, watch glass, spring balance 250g, physical weight box, wires, wooden wedge, set of tuning forks, rubber pad, beaker, funnel, laboratory thermometer, calorimeter with stirrer, resonance tube with attachment, tripod stand, spirit lamp, graduated syringe with plastic top, plastic box, spirit level, plane glass plate, cotton thread, split rubber cork, mirror strip with plastic stand, pan, grease, assorted rubber bands, wire gauze, boiling tube fitted with glass tube in a rubber cork, bimetallic strip, pinch clip, sonometer, battery eliminator, blade | quantity - 22
The tender document is a Request for Proposal (RFP) for selecting a bidder for the Design build finance operate and transfer of cement grinding units. It outlines the terms and conditions for a long-term agreement to construct and operate a cement grinding unit on a Design, Build, Finance, Operate, and Transfer (DBFOT) basis.
Agreement Duration : The agreement is valid for 30 years from the Scheduled Commercial Operation Date (SCOD).
Grant of Concession : The Owner grants the Concessionaire the right to access the project land and perform the scope of work.
Scope of Work : Includes designing, financing, construction, commissioning, stabilization, manufacturing of cement, operation and maintenance of project assets, and packaging and delivery of cement.
Raw Materials and Utilities : The Owner is responsible for providing raw materials and electricity.
Obligations of Concessionaire : Compliance with all applicable laws, maintaining safety standards, and ensuring the project assets meet performance parameters.
Commissioning and Stabilization : Detailed timelines and conditions for commissioning and stabilizing the grinding unit.
Conversion Charges : Payment terms for the conversion charges based on the lowest cost bid accepted by the Owner.
Liquidated Damages : Provisions for delay liquidated damages and shortfall liquidated damages.
Termination : Conditions under which the agreement can be terminated by either party and the consequences of termination.
Dispute Resolution : Any disputes arising under the agreement shall be resolved through arbitration.
Specifications and Standards : As per Ambuja standards
Annual Contracted Quantity of Cement
KPIs of Cement : Key KPIs of cement to be maintained
This document provides a comprehensive framework for the Concessionaire to develop and operate the cement grinding unit, ensuring compliance with all legal, technical, and operational requirements.