supply of set of hardware items for fixing stainless steel air reservoir (150 ltrs). 1. hex. hd. screw m16 x 50 - 8.8 conforming to is specification is: 1364, part-2 2002 and to icf drawing no. icf/std-3-5-066, item- 11, alt.-c/nil. qty.- 04 nos/set. 2. hex. nut m16 - 8 conforming to is specification is: 136 4, part-3 2002 and to icf drawing no. icf/std-3-5-066, item-12, alt.-c/nil. qty.- 04 nos/set. 3. hex. thin nut m16 - 05 conforming to is specification is: 136 4, part-4 2003 and to icf drawing no. icf/std-3-5-066, item-13, alt.-c/nil. qty.- 04 nos/set.. 4. plain washer 16 conforming to is specification is: 2016-67 t ab.-2, type-a & is:1977-96 fe 330 and to icf drawing no. icf/std-3-5-066, item-14, alt.-c/nil. qty.- 04 nos/set. make-tvs/dfl/unbrako/tuff or equivalent [ warranty period: 30 months after the date of delivery ] ] senior section engineer air brake shop - set of hardware items for fixing stainless steel air reservoir.
The tender document is a Request for Proposal (RFP) for selecting a bidder for the Design build finance operate and transfer of cement grinding units. It outlines the terms and conditions for a long-term agreement to construct and operate a cement grinding unit on a Design, Build, Finance, Operate, and Transfer (DBFOT) basis.
Agreement Duration : The agreement is valid for 30 years from the Scheduled Commercial Operation Date (SCOD).
Grant of Concession : The Owner grants the Concessionaire the right to access the project land and perform the scope of work.
Scope of Work : Includes designing, financing, construction, commissioning, stabilization, manufacturing of cement, operation and maintenance of project assets, and packaging and delivery of cement.
Raw Materials and Utilities : The Owner is responsible for providing raw materials and electricity.
Obligations of Concessionaire : Compliance with all applicable laws, maintaining safety standards, and ensuring the project assets meet performance parameters.
Commissioning and Stabilization : Detailed timelines and conditions for commissioning and stabilizing the grinding unit.
Conversion Charges : Payment terms for the conversion charges based on the lowest cost bid accepted by the Owner.
Liquidated Damages : Provisions for delay liquidated damages and shortfall liquidated damages.
Termination : Conditions under which the agreement can be terminated by either party and the consequences of termination.
Dispute Resolution : Any disputes arising under the agreement shall be resolved through arbitration.
Specifications and Standards : As per Ambuja standards
Annual Contracted Quantity of Cement
KPIs of Cement : Key KPIs of cement to be maintained
This document provides a comprehensive framework for the Concessionaire to develop and operate the cement grinding unit, ensuring compliance with all legal, technical, and operational requirements.