supply of - sr. no. 1 helicoflex sealing joint gasket injector assembly part no. 27.067.16.0.00 for 4.2 mwe dg installed at kaps 3 and 4 , sr. no. 2 oring for inspection door part no. 74.357.15.0.00 for 4.2 mwe dg installed at kaps 3 and 4 , sr. no. 3 o ring cylinder head cover part no. 74.466.02.0.00 for 4.2 mwe dg installed at kaps 3 and 4 , sr. no. 4 gasket viton oil seal safety slide valve part no. 79.161.50.0.00 for 4.2 mwe dg installed at kaps 3 and 4 , sr. no. 5 copper washer for fuel leak off line part no. 50.508.17.0.00 for 4.2 mwe dg installed at kaps 3 and 4 , sr. no. 6 rotocap for inlet and outlet valve assembly part no. 70.076.93.0.00 for 4.2 mwe dg installed at kaps 3 and 4 , sr. no. 7 spring for inlet and outlet valve assembly part no. 79.031.08.0.00 for 4.2 mwe dg installed at kaps 3 and 4 , sr. no. 8 outside spring for inlet and outlet valve assembly part no. 79.031.09.0.00 for 4.2 mwe dg installed at kaps 3 and 4 , sr. no. 9 spring coller assly. for inlet and outlet valve assembly part no. 79.032.94.0.00 for 4.2 mwe dg installed at kaps 3 and 4 , sr. no. 10 split coller pair for inlet and outlet valve assembly part no. 79.031.86.0.00 for 4.2 mwe dg installed at kaps 3 and 4 , sr. no. 11 safety valve on cylinder head part no. 79.044.20.0.00 for 4.2 mwe dg installed at kaps 3 and 4 , sr. no. 12 copper washer for fuel system part no. 50.508.42.0.00 for 4.2 mwe dg installed at kaps 3 and 4 - spare parts of edg | quantity - 2237
The tender document is a Request for Proposal (RFP) for selecting a bidder for the Design build finance operate and transfer of cement grinding units. It outlines the terms and conditions for a long-term agreement to construct and operate a cement grinding unit on a Design, Build, Finance, Operate, and Transfer (DBFOT) basis.
Agreement Duration : The agreement is valid for 30 years from the Scheduled Commercial Operation Date (SCOD).
Grant of Concession : The Owner grants the Concessionaire the right to access the project land and perform the scope of work.
Scope of Work : Includes designing, financing, construction, commissioning, stabilization, manufacturing of cement, operation and maintenance of project assets, and packaging and delivery of cement.
Raw Materials and Utilities : The Owner is responsible for providing raw materials and electricity.
Obligations of Concessionaire : Compliance with all applicable laws, maintaining safety standards, and ensuring the project assets meet performance parameters.
Commissioning and Stabilization : Detailed timelines and conditions for commissioning and stabilizing the grinding unit.
Conversion Charges : Payment terms for the conversion charges based on the lowest cost bid accepted by the Owner.
Liquidated Damages : Provisions for delay liquidated damages and shortfall liquidated damages.
Termination : Conditions under which the agreement can be terminated by either party and the consequences of termination.
Dispute Resolution : Any disputes arising under the agreement shall be resolved through arbitration.
Specifications and Standards : As per Ambuja standards
Annual Contracted Quantity of Cement
KPIs of Cement : Key KPIs of cement to be maintained
This document provides a comprehensive framework for the Concessionaire to develop and operate the cement grinding unit, ensuring compliance with all legal, technical, and operational requirements.
Eligibility Criteria - Download