supply of supply of harting connector set consisting of :i)01 nos. of harting coupler connecter 24 pin as per part no. harting make han e type connecter with silver plated crimped terminals 09300240301 (ba se with two lever), 09330242602 (male insert) 09330242702(female insert) 09300240510(hood) with suita ble pin as per cable size or equivalent hypertac make with silver plated crimped terminal or any other mak e with prior approval of rdso confirming to rdso specification no. rdso/pe/spec/ac/ac 0061-2005 rev-1 vide si no. 27 of attached specification suitable for lhb variant ac coaches. ii) harting coupler connector 1 6 pin as per part no. harting make han type connector with silver plated crimp terminals 09300160301(b ase with 2 lever), 0933016602 (male insert), 09330162702 (female insert), 09300160510 (hood) with suita ble pin as per cable size or equivalent hypertac make with silver plated crimped terminal or any other mak e with prior approval of rdso confirming to rdso specification no. rdso/pe/spec/ac/ac 0061-2005 rev-1 vide sl no. 27 of attached specification suitable for lhb variant ac coaches. [ warranty period: 30 month s after the date of delivery ] ] ssee coaching care centre, - harting connector
The tender document is a Request for Proposal (RFP) for selecting a bidder for the Design build finance operate and transfer of cement grinding units. It outlines the terms and conditions for a long-term agreement to construct and operate a cement grinding unit on a Design, Build, Finance, Operate, and Transfer (DBFOT) basis.
Agreement Duration : The agreement is valid for 30 years from the Scheduled Commercial Operation Date (SCOD).
Grant of Concession : The Owner grants the Concessionaire the right to access the project land and perform the scope of work.
Scope of Work : Includes designing, financing, construction, commissioning, stabilization, manufacturing of cement, operation and maintenance of project assets, and packaging and delivery of cement.
Raw Materials and Utilities : The Owner is responsible for providing raw materials and electricity.
Obligations of Concessionaire : Compliance with all applicable laws, maintaining safety standards, and ensuring the project assets meet performance parameters.
Commissioning and Stabilization : Detailed timelines and conditions for commissioning and stabilizing the grinding unit.
Conversion Charges : Payment terms for the conversion charges based on the lowest cost bid accepted by the Owner.
Liquidated Damages : Provisions for delay liquidated damages and shortfall liquidated damages.
Termination : Conditions under which the agreement can be terminated by either party and the consequences of termination.
Dispute Resolution : Any disputes arising under the agreement shall be resolved through arbitration.
Specifications and Standards : As per Ambuja standards
Annual Contracted Quantity of Cement
KPIs of Cement : Key KPIs of cement to be maintained
This document provides a comprehensive framework for the Concessionaire to develop and operate the cement grinding unit, ensuring compliance with all legal, technical, and operational requirements.