supply of - tab deflazacort 6 mg , tab montelukast 10 mg and levocetrizine 5 mg , tab pregabalin 75 mg and ntp 25 mg and methylcobalamine , cap gabapentine 400 mg , tab methylcobalamine 1500 mcg , tab isosorbide dinitrate 10 mg , tab torsemide 10 mg , tab atorvastatine 10 mg , tab metoprolol tartrate 50 mg , tab ramipril 2 point 5 mg , tab metorpolol xl 25 mg , tab asprine 75 mg , tab disprin 350 mg , tab clopidrogel 75 mg , tab vildagliptin 50 mg , tab amlodipine besalate 5 mg , tab telmisartan 40 mg , tab losartan 25 mg , tab losartan 50 mg , tab ramipril 5 mg , tab enalapril 5 mg , tab telmisartan 40 mg and hctz 12 point 5 mg , tab fexofenadine 180 mg , tab clinidipine 5 mg , tab spironalacatone 25 mg , tab pantoprazole 40 mg and domperidome 10 mg , tab thyroxine point 25 mcg , tab thyroxine point 50 mcg , cream luliconazole , oint mupirocin , mosturizer cream , tab glucosamine 250 mg and chondroitin sulphate 200 mg , tab revital multivitamin and multiminiral - medicines | quantity - 32780
The tender document is a Request for Proposal (RFP) for selecting a bidder for the Design build finance operate and transfer of cement grinding units. It outlines the terms and conditions for a long-term agreement to construct and operate a cement grinding unit on a Design, Build, Finance, Operate, and Transfer (DBFOT) basis.
Agreement Duration : The agreement is valid for 30 years from the Scheduled Commercial Operation Date (SCOD).
Grant of Concession : The Owner grants the Concessionaire the right to access the project land and perform the scope of work.
Scope of Work : Includes designing, financing, construction, commissioning, stabilization, manufacturing of cement, operation and maintenance of project assets, and packaging and delivery of cement.
Raw Materials and Utilities : The Owner is responsible for providing raw materials and electricity.
Obligations of Concessionaire : Compliance with all applicable laws, maintaining safety standards, and ensuring the project assets meet performance parameters.
Commissioning and Stabilization : Detailed timelines and conditions for commissioning and stabilizing the grinding unit.
Conversion Charges : Payment terms for the conversion charges based on the lowest cost bid accepted by the Owner.
Liquidated Damages : Provisions for delay liquidated damages and shortfall liquidated damages.
Termination : Conditions under which the agreement can be terminated by either party and the consequences of termination.
Dispute Resolution : Any disputes arising under the agreement shall be resolved through arbitration.
Specifications and Standards : As per Ambuja standards
Annual Contracted Quantity of Cement
KPIs of Cement : Key KPIs of cement to be maintained
This document provides a comprehensive framework for the Concessionaire to develop and operate the cement grinding unit, ensuring compliance with all legal, technical, and operational requirements.