supply of - u.c 45 men set degchie 305 mm , tumbler stainless steel600 ml , stainless steel hamam dasta , plastic container05 ltrs , laundry press commercial mk2 , potato peeler manual ss , machine weighing platfor 100 kg dtype , sieves atta circular mk 2 610 mm dia , container 1 ltr ss with lid , machine weighing plat 150 kg , knifecook 230mm , battery 1.5 vdc size aa , bty dry 1 5 volts no 1 , battry dry 3 volt no 1 , battery dry 1.5volt no6 , lithium cell 3.5v dc size aa ls6 ex , bty dry 1.5v no3 metal clad , bty sec por ni cd 12v 7ah , bslap 12v 75ah c10 without ms box , bty sec portable 12v 75 ah at 10 hrs , baterty secondary portable ni cd - machine weighing plate form | quantity - 27475
The tender document is a Request for Proposal (RFP) for selecting a bidder for the Design build finance operate and transfer of cement grinding units. It outlines the terms and conditions for a long-term agreement to construct and operate a cement grinding unit on a Design, Build, Finance, Operate, and Transfer (DBFOT) basis.
Agreement Duration : The agreement is valid for 30 years from the Scheduled Commercial Operation Date (SCOD).
Grant of Concession : The Owner grants the Concessionaire the right to access the project land and perform the scope of work.
Scope of Work : Includes designing, financing, construction, commissioning, stabilization, manufacturing of cement, operation and maintenance of project assets, and packaging and delivery of cement.
Raw Materials and Utilities : The Owner is responsible for providing raw materials and electricity.
Obligations of Concessionaire : Compliance with all applicable laws, maintaining safety standards, and ensuring the project assets meet performance parameters.
Commissioning and Stabilization : Detailed timelines and conditions for commissioning and stabilizing the grinding unit.
Conversion Charges : Payment terms for the conversion charges based on the lowest cost bid accepted by the Owner.
Liquidated Damages : Provisions for delay liquidated damages and shortfall liquidated damages.
Termination : Conditions under which the agreement can be terminated by either party and the consequences of termination.
Dispute Resolution : Any disputes arising under the agreement shall be resolved through arbitration.
Specifications and Standards : As per Ambuja standards
Annual Contracted Quantity of Cement
KPIs of Cement : Key KPIs of cement to be maintained
This document provides a comprehensive framework for the Concessionaire to develop and operate the cement grinding unit, ensuring compliance with all legal, technical, and operational requirements.
Eligibility Criteria - Download