work of servicing and maintenance of forklift, tempo (tata) and hydra crane on as and when required basis for workshop at dgbps for period of 18 months., work of hrsg ibr joint repairing, pipe replacement & hrsg hp, ip, lp stream annual inspection of 375 mw ccpp- iii, dhuvaran gbps. (for mi / hgpi shutdown)., works of overhauling of various size of butterfly valve with require spares for ccpp-iii dgbps. (as & when require basis)., work of fabrication related job for plant stability, reliability and safety point for 375 mw ccpp-iii, dhuvaran. (for mi/hgpi shutdown)., works of checking & maintenance of isolated phase bus duct (ipbd) & segregated phase bus duct (spbd) installed at ccpp-iii, dgbps., supply of white plastic transparent sheet at dgbps supply of laboratory items & x-ray materials for gsecl dgbps hospital., supply of industrial pedestal fan and led lights for ccpp-i, ii & iii, dhuvaran, gsecl., supply of complete plc panel for control room air condition plant for ccpp-2, dgbps
The tender document is a Request for Proposal (RFP) for selecting a bidder for the Design build finance operate and transfer of cement grinding units. It outlines the terms and conditions for a long-term agreement to construct and operate a cement grinding unit on a Design, Build, Finance, Operate, and Transfer (DBFOT) basis.
Agreement Duration : The agreement is valid for 30 years from the Scheduled Commercial Operation Date (SCOD).
Grant of Concession : The Owner grants the Concessionaire the right to access the project land and perform the scope of work.
Scope of Work : Includes designing, financing, construction, commissioning, stabilization, manufacturing of cement, operation and maintenance of project assets, and packaging and delivery of cement.
Raw Materials and Utilities : The Owner is responsible for providing raw materials and electricity.
Obligations of Concessionaire : Compliance with all applicable laws, maintaining safety standards, and ensuring the project assets meet performance parameters.
Commissioning and Stabilization : Detailed timelines and conditions for commissioning and stabilizing the grinding unit.
Conversion Charges : Payment terms for the conversion charges based on the lowest cost bid accepted by the Owner.
Liquidated Damages : Provisions for delay liquidated damages and shortfall liquidated damages.
Termination : Conditions under which the agreement can be terminated by either party and the consequences of termination.
Dispute Resolution : Any disputes arising under the agreement shall be resolved through arbitration.
Specifications and Standards : As per Ambuja standards
Annual Contracted Quantity of Cement
KPIs of Cement : Key KPIs of cement to be maintained
This document provides a comprehensive framework for the Concessionaire to develop and operate the cement grinding unit, ensuring compliance with all legal, technical, and operational requirements.